1. The Subject Of The Contract - Described In Annexes 5 And 6 To Swz - Includes, Among Others: 1) Preparatory And Order Works, Including Cleansing And Organizing The Entire Area Falling Into The Scope Of Biological Material (Waste Such I Am Grass, Branches, Etc. And Municipal Waste) Along With Waste Collection, 2) Grubbing Trees, Sanitary And Care Cuttings, Export And Disposal, 3) Geodetic Selection Of Elements Of The Undertaking, 4) Execution Of The Playground, 5) Performance Of The Playground For Children With Fence, 6) Construction Of A Dog Catwalk With A Fence, 7) Making Park Paths And Pedestrian Routes, 8) Making Pavements Hardened From Concrete Cubes, 9) Execution Of Off -Road Stairs And Seats And Other Concrete Elements, 10) Cleaning And Reforming Existing Slopes, 11) Performing Earthworks Including Leveling The Terrain And Making Embankments, 12). Performing Lawns And Plantings, 14) Installation Of Park Benches, Racks, Garbage Cans And Other Elements Of Small Architecture, 15) Execution Of The Screen Sanitary Cabin Buildings, 16) Execution Of Lighting With Connection And Electrical Installation, 17) Execution Of The Monitoring System Installation According To The Executive Design Of The Electrical Industry, 18) Execution Of All Necessary Construction Works Ensuring The Correct Connection Of Built And Renovated Surfaces With Surfaces Existing Ones That Are Not Subject To Replacement Or Renovation (E.G. Plots Limit) And All Works Necessary For The Proper Functioning Of The Rebuilt Communication System, 19) Organizing The Construction Site After All Activities Related To The Investment. Note! Regulations. - Due To The Planned Land Development, It Is Planned To Reform Existing Slopes, As Well As Leveling And Leveling Of The Areas Planned As A Lawn In The Eastern Half Of The Thermal. All Earth Masses Obtained After Leveling The Area Should Be Developed In The Investment. 2. The Contractor Will Be Obliged - At His Own Expense And On His Own - Also, Among Others To: 1) Ensuring Technical Supervision, 2) Ensuring Full Geodetic And Cartographic Geodetographic Support (Geodetic And Cartographic Works Should Be Carried Out In Accordance With The Technical Conditions Issued By The City Geodeth Office. The Contractor Will Be Obliged To Conduct Geodetic Service And Perform The As -Built Geodetic Documentation In Accordance With The Applicable Technical Conditions For Conducting Geodetic Work - Regarding The Assumption Of The Database Gesut And Bdot 500 In The City Of Szczecin In 2016 And Conducting A Part Of The Digital System Of The State Geodetic And Cartographic Resource In The Sip Geo-Info 7 System), 3) Traffic Organization On Construction Time Together With The Development Of Documentation (Including A Traffic Organization Project) And Necessary Arrangements And Occupation Of The Road Lane, Including Calculated Fees, Marking And Restoration Such A Need, 4) Securing Existing Networks And Facilities In The Area Of Works And Cooperation With Network
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.