Tenders Are Invited For Technical Documentation For The Task Reconstruction Of Poviat Road No. 2337C Żnin - Jadowniki - Szczepanowo On The Section From The Town Of Jadowniki Knightk To The Town Of Kierzkowo With The Construction Of A Pedestrian Road
Tenders Are Invited For Technical Documentation For The Task Reconstruction Of Poviat Road No. 2337C Żnin - Jadowniki - Szczepanowo On The Section From The Town Of Jadowniki Knightk To The Town Of Kierzkowo With The Construction Of A Pedestrian Road
The Subject Of The Contract Is: Developing Technical Documentation For The Task Entitled Reconstruction Of Poviat Road No. 2337C Żnin - Jadowniki - Szczepanowo On The Section From The Town Of Jadowniki Knightk To The Town Of Kierzkowo Together With The Construction Of A Pedestrian Road. In The Scope Of The Task, The Task Should Be Designed And Developed By The Reconstruction Of Poviat Road No. 2337C Żnin - Jadowniki - Szczepanowo On A Section Of Around 1570 M Along With The Construction Of A Road For Pedestrian Road: From Km 5+785 To The Section: Km 6+095 P. Minimum 5 Cm B) Making The Abrasive Layer With A Thickness Of 4 Cm, C) Reconstruction And Construction Of Conventions On The Opposite Side Than A Road For Pedestrians, D) Hardening Of The Roadside From A Mechanically Stabilized Broken Aggregate. The Gracefulness Of The Designed Pedestrian Road Use The Minimum Minimum Allowed By The Ordinance Of The Minister Of Infrastructure Of 24 June 2022 On Technical And Construction Provisions Regarding Public Roads. The Project Also Includes: A) For Pedestrians Made Of Gray Concrete Cubes, Except For Two Stripes At The Curb, Which Should Be Made Of Red Cubes; B) Reconstruction And Construction Of Conventions To The Border Of The Road Lane For All Plots And Internal Roads, The Surface Of The Downhill Rides Should Be Made Of Concrete Red Cube, Except For Municipal And Internal Roads, Which Should Be Made Of Concrete, Which Should Be Made Of Concrete. Asphalt; C) Execution Of A Pedestrian Crossing Between The Designed Pedestrian Route In Jadowniki Together With Dedicated Lighting Connected To Road Lighting; D) Hardening Access To Bus Shelters; E) Dehydration To Be Agreed With The Ordering Party; F) Reconstruction Of The Surface Of The Poviat Road On The Section Of The Designed Pedestrian Road. If At The Stage Of Developing Project Documentation A Collision With Technical Infrastructure Does Not Related To The Needs Of Road Management Or The Needs Of Road Traffic, The Contracting Authority Will Check The Possibility Of Removing The Collision At The Expense Of The Network Gestor Or Order An Additional Industry Study. Divisions Of Real Estate (On The Section Covered By The Range) In A Minimum Level Enabling Location Of A Pedestrian Road Directly At The Edge Of The Road. It Is The Contractors Responsibility To Thoroughly Verify The Course Of The Road Section Covered By The Task And Take Into Account In The Price Of The Offer Of All Divisions Of Real Estate Necessary For The Location Of The Road And Road For Pedestrians In The Plan. In The Case Of Underestimation Of Real Estate Divisions At The Stage Of Submitting The Offer, This Will Not Be The Basis For Increasing Remuneration. The Map For Design Purposes Should Be Demonstrated By Legal Limits. In The Event That In The Poviat Geodetic And Cartographic Resources There Are Data That Allows You To Find Or Resume Border Signs Should Be Found And Resumed With Measurement, While If There Is No Such Data In This Reso
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.