Painting Rooms And Replacement Of Carpets In The Inspectorate At The Work Collections: 1) Preparatory Works: A) Floors With Foil- Carpet Floor Coverings, Pvc Floor Coverings, Stoneware Tiles, Etc., B) Protection Of Windows, Doors, Contacts- Wrapping With Painting Tape, C). The Renovated Room With Re -Insertion, Securing The Server Wardrobes, D) Securing Racks Of The Rankings With Foil Cover, 2) Construction Works In The Area Of Walls: A) Scraping And Washing Of Old Paint (Walls And Ceilings), B) Repair Of Cracks In Plasters Of Walls And Ceilings, C) Location Prefabricated And Concrete Poured, D) Gluing One Layer Of Mesh On The Walls And Ceilings, E) Priming The Substrates Of Walls And Ceilings, F) Two -Time Painting With Emulsion Paints Of Internal Surfaces -Office Supplies And Ceilings, G) Two -Rate Painting Of Latex Paints Corridors, H) Two Thermo -Resistant Enamel, I) Single Painting Of Central Heating Pipes Oil Paint Along With Ground Cleansing, 3) Construction Works In The Range Of Ceilings: A) Scraping And Washing Of Old Paint, B) Cleaning Of Porous Surfaces (Mosaic Plaster On Strings), C) Repair Of Cracks In Wall Plasters, D) Sticking One Mesh Layer On The Walls In The Walls, E Plaster Cracks, Plaster Internal, Single -Layer Walls, F) Priming With Primers, G) Painting With Latex Paints Twice The Wall Corridors, H) Double Painting With Emulsion Paints Of Office Rooms, 4) Construction Works In The Field Of Ceilings: A) Scraping And Washing Old Paint, B) Repair Cracks In Ceiling Plasters, C) Sticking One Layer Of Mesh On The Ceilings At The Cracks, D) Elimination Of Inequalities On The Ceilings And Plasters Cracks, Plaster Internal, Single -Layer Ceilings, E) Grounding Soils, F) Dual Painting With Emulsive Paints Internal Stress, 5) Other Works: A) Double Paint Paint Of Window Sills, B) Twice Painting With Oil Paint, C) Two -Time Painting With The Thermo -Resistant Enamel Of Rib Radiators, D) Single Painting With Oil Paint Of C.O. With Ground Cleaning, E) Deportation And Utilization Of Debris, F) Filling The Gaps With Silicone Mass, G) Dismantling Of Ventilation Grilles Along With Utilization, H) Filling Ventilation Grilles (Color Ral 9010) In The Walls With The Placement Of The Assembly Site, 6) Floor And Floorwork: A) Breaking Of Plastic Flooring, B) Mechanical Sanding, B) Old Floors, C) Soil Priming, D) Corrective And Compensatory Screeds-Self-Leveling Masszpachl Gr. 2 Mme) Soil Priming, F) Placing And Welding Of Plastic Floor Coverings, G) Installation Of Wall Slats, H) Installation Of Thresholds, Note: The Liner Should Be Laid Freely. Colorads Paints:- Corridor Walls, Staircase- Latex Paint In The Color Of The Ral 9010 Palette,- Office Paint- Emulsion Paint- Emulsion Hydrogenous, Resistant To Dirt In Color From The Ral 9010 Palette,- Ceiling- White Emulsion Paint From The Ral 9003 Palette,- Rib Radiators- Ral Thermo-Resistant Enamel 9010,- Central Heating Tubes Matte Oil In Ral 9010,- Window Sills, Oil Paint In Ral 9010,- Frames Of The S