Tenders Are Invited For Execution Of A Separate Power Supply With Electricity And Installation Of Individual Measuring Systems For Each Premises In The Building Ul. Jasminowa 11 In Elbląg
Tenders Are Invited For Execution Of A Separate Power Supply With Electricity And Installation Of Individual Measuring Systems For Each Premises In The Building Ul. Jasminowa 11 In Elbląg
The Subject Of The Contract Covers A Residential, Multi-Family, Basement, 4-Frame Building In Elbląg, Located On The 246/2 Plot Within 11 At Ul. Jasmine 11 In Elbląg. The Building Has: 103 Residential Premises, 1 Commercial Premises (An Annex Used By The Family Benefits Of The Municipal Office In Elbląg) And 6 Garages Located In The Basement Part. There Are Also 6 Residential Premises At The Basement Level, Including Two With A Separate, Direct Entrance To The Premises From The Yard (1D And 1F Premises). 4 Separate Entrances Lead To The Building - Staircases. Each Cage Has A Different Number Of Premises Of Different Numbering (A Different Order Of Numbering Of Premises Due To The Division Of The Building Into Cages And Merging Some Premises Over The Years). In The Basement Part There Are Also Utility And Technical Rooms. The Building Has 4 Floors And A Partially Inhabited Basement Part With A Usable Area Of 3.751.41 M2, Building Area 1,557.00 M2 And A Volume Of 17,557.00 M3. Access To The Property Is From Jaśminowa Street. Renovation Works Include, Among Others, A Replacement Of The Electrical Installation In The Administrative Part With Electrical Equipment, 2) Dismantling Of The Wlz Line (Internal Supply Line) With Installations Supplying Residential And Utility Premises As Well As Existing Electrical Meter Systems, 3) Construction Of New Wlz Supplying Lines With Measuring Systems In Double -Core Switchboards And In The Basement Part, 4) Construction Of New Power Supply Installations, 4) Residential And Commercial Premises, The Remaining Scope Of Works To Be Executed Was Indicated In Pfu (Functional And Utility Program) Constituting Annex 10 To Swz. The Contracting Authority Also Recommends Making A Local Vision To Properly Estimate The Value Of The Order. 3. Other Terms Of The Contract: 1) Implementation Of A Construction Project - The Ordering Party By Project Documentation Understands The Implementation Of A Construction Project, I.E. An Architectural And Construction Design (Pab - 4 Copies) And A Technical Design (Pt - 3 Copies), 2) Execution Of Construction Works In The Electrical Industry On The Basis Of The Approved Construction Project, 3) At The Design Stage At The Design Stage Making All Arrangements With The Electricity Supplier, Ordering And Other Entities In In Order To Obtain The Necessary Administrative Decision Enabling The Implementation Of The Designed Works And Subsequent Use Of The Facility, 4) Performing The Collage Survey In The Manner Indicated In The Functional And Utility Program, 5) Preparing The Work Schedule Before The Start Of Construction Works. 6) Detailed Scope Of Works To Perform Is Determined By: The Contract Template Constituting Attachments No. 9 To Swz And Functional And Use Program As Well Maps) Constituting Annex 10 To Swz.7) The Contracting Authority Guarantees That The Minimum Value Of The Contract For The Contractor Will Amount To 60% Of The Total Gross Remuneration. The Contracting Authority Reserves T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.