Tenders Are Invited For Cleaning The Rainwater Drainage System

Tender Detail

99783548
ZP.271.20.2025.PZ
Self-Funded
Tenders Are Invited For Cleaning The Rainwater Drainage System
NCB
central europe
European Union
04-08-2025

Work Detail

3 The Subject Of The Contract Was Accurately Described In Annex 1 To Swz - Description Of The Subject Of The Contract. 3. The Rainwater Sewage System Should Be Protected Against The Access Of Bystanders During The Performance Of The Cleaning Service. After Performing The Service, The Rainwater Sewage Will Be Available To All Users In The Field Of Rainwater And Snowmelt Drainage From The Road Surface. The Employer Does Not Specify The Requirements For Availability For Disabled People, Because Cleaning The Rainwater Sewage Determines The Nature Of This Order. 4. Type Of Order: Services. 5. Cpv Codes: 1) Main Cpv Code:- 90640000-5: Services Of Cleaning And Emptying Sewage Channels; 2) Additional Cpv Codes:- 90641000-2: Sewage Channel Cleaning Services;- 90642000-9: Sewage Channel Emptying Services. 6. The Employer Does Not Reserve The Obligation To Perform Personal Tasks By The Contractor In Person, In The Manner Specified In Art. 121 Of The Pzp Act. 7. The Contractor May Entrust The Performance Of Part Of The Subcontractors Order. The Contracting Authority Requires The Contractor To Indicate, In The Offer, Parts (Ranges) Of The Order, Which He Intends To Entrust To Subcontractors, And The Contractor Provides The Names Of Any Subcontractors, If They Are Already Known. To This End, The Contractor Should Provide Relevant Information In The Offer Form, Constituting Annex 2 To Swz. In The Event That The Contractor Does Not Intend To Perform The Order With The Participation Of Subcontractors, Enter The Not Applicable Or Other Similar Wording In The Right Place In The Table. 8. Entrusting The Performance Of Part Of The Order To Subcontractors Does Not Release The Contractor From Liability For Proper Performance Of The Contract. 9. The Contracting Authority Divided The Order Into Parts By Awarding The Contract In Two Separate Proceedings. The Contracting Authority Believes That The Further Division Of The Contract In This Procedure Will Not Be Made For Technical, Organizational And Economic Reasons. Considering The Fact That The Task To Be Performed Is Technically Simple, And The Division Would Cause Difficulties In Its Implementation, E.G. In The Coordination Of Works, Depreciation Of Equipment, And As A Result The Intended Final And Material Result Would Be Disturbed

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail