4. Part 1 - Delivery, Assembly And Launching Of New Photovoltaic Installations On The Buildings Of Rural Club Rooms, Volunteer Fire Brigades, Kindergartens And Libraries1) The Subject Of The Contract Is The Development Of Technical Documentation, And Then On Its Basis Delivery, Assembly And Launch Of Factory New Photovoltaic Installations: A. On The Building Of The Volunteer Fire Brigade In Andrespol • A 11.88 Kwp Solar Micro -Installation Consisting Of 30 Monocrystalline Solar Modules 405Wp.B. On The Building Of The Volunteer Fire Brigade In Justynów • A 11.88Kwp Solar Micro -Installation Consisting Of 30 Monocrystalline Photovoltaic Modules 405 Wp.C. On The Building Of The Village Common Room In Janówka • A 3.61Kwp Solar Micro -Installation Consisting Of 9 Monocrystalline Solar Modules 405Wpd. On The Building Of The Village Common Room In Stróży • Photovoltaic Micro -Installations With A Capacity Of 3.94 Kwp Consisting Of 10 Monocrystalline Solar Modules 405 Wpe. On The Local Government Building Of The Kindergarten On Ul. Ceramic In Andrespol • 10.13Kwp Solar Installation Consisting Of 25 Monocrystalline Solar Modules 405 Wpf. On The Building Of The Municipal Public Library - A Branch In Justynów • Photovave Micro -Installation With A Power Of 1.45 Kwp Consisting Of 4 Monocrystalline Photovoltaic Modules 405 Wp.2) The Subject Of The Contract Includes The Performance Of The Following Activities For Each Location Separately: A. Performing Multi -Branch Technical Projects Of Solar Installations, Hereinafter Pv, B. Obtaining The Required Opinions, Connection Conditions, Arrangements And Checking Of Design Solutions To The Extent Resulting From Applicable Regulations, C. Appearing On Behalf Of The Ordering Party On All Issues Related To The Performance Of Works And In Formal Matters Required By The Energy Supplier, D. Preparation Of Bill Of Quantities And Cost Estimates, E. Performing Assembly And Installation Works Related To: E1. Installation Of Support Structures For Pv, E2 Installations. Installation Of Pv Panels On Prepared Constructions, E3. Installation Of Dc And Ac Installations, E4. Inverters Assembly, E5. Execution Of Security Systems, E6. Making A Connection With Existing Electrical Installations In The Building, E7. Conclusion Of Lightning Protection Installations Installed Solar Generators, E8. Launching The Installation.F. Submitting The Application To The Poviat Headquarters Of The State Fire Service, G. Carrying Out On Behalf Of The Employer Full Procedure Required For Connection And Launch Of Installations, Including Submitting The Required Documents For The Installation Of Two -Way Meters, H. Implementation Of As -Built Documentation. 3) The Contracting Authority Additionally Requires: A. The Contracting Authority Requires The Submission Of Technical Documentation To Be Approved Before Starting The Work. The Contractor Will Be Obliged To Conduct The Training Of Designated Representatives Of The Employer - Installation Users, In The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.