• Applying Soil Protection For Existing Quay Wall; • The Outbreak Of The Existing Flooring (Incl. Protected Train Tracks, Crane Traces, Cobblestones) Where They Must Be Replaced Under The Supervision Of A Specialist; • Moving And Replacing The Protected Historic Harbor Cranes; • Performing And Placing Anchors Under The Pre -Anchors To Anchor The Quay Wall; • Partial Demolition Of The Existing Quay Wall To A Certain Height. The Front Surface And The Cover Stone Of The Quay Wall In Natural Stone Are Broken Off With The Aim Of Reusing The Parementstone As Finishing Of The Kesp. The Existing Bolders Are Also Carefully Broken Out With The Aim Of Reusing These; • Rebuilding Of The Kesp + Parement, On Top Of The Historic Quay Wall. The Historical View Must Be Reconstructed. This Is Done By A Combination Of Structural Concrete, Placing Recovered Natural Stone (Parement) And The (Re) Placing Of New Or Not New Cover Stones In Belgian Bluestone; • Replacing The Cobblestone Pavement; • Replacing The Sockets Of The Operation Of The Historic Harbor Cranes; • Provided With A Passing Water Pipe In Collaboration With Water-Link; • Provide Waiting Tubes For Future Power Cables To The Sockets; • Placing Ladders, Rubbing Wood, Cage Ladders, Gauge Plates, Lids, ...
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.