Construction Work - New Training In The Care And Community Health Training Essc In Saint -Loup (Pompaples) - Cfc 271 Plasterry. The Project Is Planned To Accommodate 700 Students On Three Levels On Its Commissioning. On The Upper Ground Floor And The Floor Are The Premises Intended For Teaching, While On The Lower Ground Is The Services: The Refectory, The Administration And The Premises For Teachers. Some Deposit And Storage Premises Occupy A Partial Basement. The Carrying Structure Is Made Of Reinforced Concrete And The Façades In Deactivated Concrete, Flowing In Place, Revealing A Strong Texture Of The Gravel Of Light Yellow Color. Inside, A Large Number Of Partitions, Between Premises Are Wood As Well As Fixed Arrangements, Acoustic Absorption And Doors. Energetically, Construction Is Designed To Achieve Performance Equivalent To Standard Minergie P 2017. Heat Production Is Ensured By The Cad. The Premises Are Ventilated By A Double -Flow Mechanical Installation With Energy Recovery, Photovoltaic Sensors Are Installed On The Green Roof. Surfaces And Volumes: - Determining Floor Surface - Spd: 10300 M2 - Spur Surface - Sp: 11700 M2 - Net Surface - Sn: 10,500 M2 - Energy Reference Surface - Sre: 10276 M2 - Built Volume - Vb: 47900 M3 The Present Doffre Call Concerns The Plastering Work Of The Building Including: - 3000 M2 Fire And Acoustic Requirements, - 800 M2 Of Plasterboard Dubbing With And Without Fire And Acoustic Requirements, - 5700 M2 Of Interior Paint On Walls And False Ceilings In Plasterboard And Technical Equipment On The Ceiling.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.