Tenders Are Invited For It Is A Contract Of Works That Consists Of The Replacement Of The Existing Diesel Boiler With A New Biomass Installation, Including Biomass Boiler, Biomass Storage And Transportation Between Storage And Boiler, And With The Performance, It Will Also Be Acted On The Primary Distribution Circuit, In The Existing New Circuit Room, In Order To Connect The Existing Circuits To The Existing Circuits, Dedistribution. The Hydraulic Installation (Primary Circuit) Inside The Old And Inefficient Booths Room, For This Reason The Existing Distribution Collectors Will Be Replaced In The Boiler Room And The Circulatoring Pumps Documentation And Final Management Of The Work, Currently As A Thermal Energy Production Apparatus For The Heating, With A 250 Cpa Cpa, With A Cpa Cpa, 290.7Kw.This Boiler Incorporates A 28 -L Techno Burner With A Power Of 95/166 -332Kw. This Boiler, And More Specifically Its Burner, Use Diesel As Acombustible, And There Is No Inertia Tank. There Ar
Tenders Are Invited For It Is A Contract Of Works That Consists Of The Replacement Of The Existing Diesel Boiler With A New Biomass Installation, Including Biomass Boiler, Biomass Storage And Transportation Between Storage And Boiler, And With The Performance, It Will Also Be Acted On The Primary Distribution Circuit, In The Existing New Circuit Room, In Order To Connect The Existing Circuits To The Existing Circuits, Dedistribution. The Hydraulic Installation (Primary Circuit) Inside The Old And Inefficient Booths Room, For This Reason The Existing Distribution Collectors Will Be Replaced In The Boiler Room And The Circulatoring Pumps Documentation And Final Management Of The Work, Currently As A Thermal Energy Production Apparatus For The Heating, With A 250 Cpa Cpa, With A Cpa Cpa, 290.7Kw.This Boiler Incorporates A 28 -L Techno Burner With A Power Of 95/166 -332Kw. This Boiler, And More Specifically Its Burner, Use Diesel As Acombustible, And There Is No Inertia Tank. There Ar
It Is A Contract Of Works That Consists Of The Replacement Of The Existing Diesel Boiler With A New Biomass Installation, Including Biomass Boiler, Biomass Storage And Transportation Between Storage And Boiler, And With The Performance, It Will Also Be Acted On The Primary Distribution Circuit, In The Existing New Circuit Room, In Order To Connect The Existing Circuits To The Existing Circuits, Dedistribution. The Hydraulic Installation (Primary Circuit) Inside The Old And Inefficient Booths Room, For This Reason The Existing Distribution Collectors Will Be Replaced In The Boiler Room And The Circulatoring Pumps Documentation And Final Management Of The Work, Currently As A Thermal Energy Production Apparatus For The Heating, With A 250 Cpa Cpa, With A Cpa Cpa, 290.7Kw.This Boiler Incorporates A 28 -L Techno Burner With A Power Of 95/166 -332Kw. This Boiler, And More Specifically Its Burner, Use Diesel As Acombustible, And There Is No Inertia Tank. There Are 2 Collectors, Impetus And Return. Each Branch Has Its Driving Group.-Of The 4 Branches 2 Are 2 And The Other 2 Are 1 1/4. This Installation Is In Charge Of The Heating Of The Building. It Does Not Produce A.C.S. It Is Proposed To Replace The Existing Boiler With A New Biomass Boiler, Herz Firematic Caldera 301 T-Control, Of Up To 301Kw, With Up To 301Kw, With Up To 301Kw, Estella As Fuel.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.