Construction Of A Bridge To The Island Of Edward In Złymyśl The Subject Of The Contract Is The Execution Of Construction Works Related To The Construction Of A Year -Round Plate In The Design Design And Build According To The Functional And Utility Program. As Part Of The Task, It Is Planned To Dismantle The Existing Floating Bridge, Permanent Platforms And Abutments, Which Should Be Modernized By Adapting To The Developed Project, Developing A Complete From The Point Of View Of The Purpose That Design Documentation Is To Serve, Obtaining Necessary Decisions, Permits, Permits, Opinions And Arrangements, Execution, Delivery And Assembly Of A Floating Platform. Characteristics Of The Object: I Shaped Bridge Made Of Modular Retail Concrete Elements With A Clearance Between Float, With A Concrete Deck With Basalt Reinforcement Dispersed With A Bridge Covering And A Non -Slip Mineral Route Length 160 M Technological And Led Lighting. In Detail, The Bridge And Scope Of Works For Design And Execution Are Specified In Pfu.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.