4.1. The Subject Of The Contract Is Construction Works As Part Of The Investment Task Entitled Expansion And Modernization Of The Water Supply Network In The Telatyn Commune - Stage Iii. 4.2. The Scope Of The Subject Of The Contract Includes The Construction Of A Concrete Expansion Tank Of 2 X 100M³ At The Water Supply Station In Kryszyn, Including The Following Works: Demolition And Disassembly Works, Construction Of Reinforced Concrete Tanks Insulated With A Capacity Of 2 X 100M A Used To Accumulate Water For The Needs Of The Water Supply, Execution Of An Internal Reservoir From Pe Pres Of 100Rcsdr11 13 Construction Of Water And Sewage Technological Cables Between Designed Tank Cables And Technological Cables Existing Existing Electrical And Control System. Making A New Fence Between The A--G-F-E Nodes, The Reservoir Is A Two-Chamber Building, From Prefabricated Elements (6 Pcs For Each Chamber). The Shape Of The Cylindrical (Cylindrical) Tank Chamber With An External Diameter Of 6.0M And A Height Of 4.70M. Inside The Tank, A Concrete Spout Of 50Cm Thick With A Reduction In The Transitions Of Technological Cables From C25/30, Xc4 Concrete. Walls And The Bottom Of The Tank Protected With A Waterproof Coating With Pzh Approval Allowing Contact With Clean Water. The Tanks Are Partly Sprinkled With The Ground To A Height Of 150Cm Above The Zero Of The Tank. Access To The Interior Of The Tank Chambers Is Provided With The Help Of Off -Road Stairs Arranged On The Embankment And Then Through A Steel Ladder Inside The Stainless Steel Chambers And A Tight Square Hatch With Dimensions Of 80 X80 Cm. From Stainless Steel. 4.3. A Detailed Description Of The Subject Of The Contract Can Be Found In Annex 1 To Swz. It Consists Of The Following Documents: 1) Project Documentation, Including: Technical Projects; Land Development Project; Architectural And Construction Design2) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), 3). The Bill Of Quantities Is Auxiliary. Speech During The Implementation Of The Contract Not Included In The Pre -City Or Works In A Larger Amount In Relation To The Pre -City Adopted In The Pre -City Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Project Documentation Referred To In Point 4.4, Item 1) And Stwirb.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.