1) The Subject Of The Order Is The Construction Of A Gym With Sanitary And School Facilities In Niwiski Connected To The Existing School On The Plot On Plot No. 173/2, Precinct Niwiski, Commune Mokobody. As Part Of The Task, An Internal Gas Installation And A Reservoir Installation For Liquid Gas With An Underground Tank With A Capacity Of 6400L, Rainwater Tank With A Capacity Of 20M3. 2) The Scope Of Works Includes, Among Others: • Variable And Preparatory Works • Foundations • Hydro -Insulation • Murowy And Reinforced Concrete Works • Wooden Roof Truss • Roof Covering • Painting Works • Floor Cladding • Joinery. Land Development Project-1 Pcs, Architectural And Construction Design- 1 Pcs, Technical Design Electrical And Teletechnical And Teletechnical-1 Pc, Technical Design Sanitary Industry- 1 Item, Architectural Technical Design- 1 Pcs, Technical Design- Construction Design 1 Pc. Sanitary- 1 Item, Technical Specification And Acceptance Of Works Construction Industry- 1 Item, Technical Specification And Acceptance Of Works Electrical And Teletechnical Industry- 1 Item, Values (Construction, Sanitary, Electric)- 4 Pcs The As -Built Signed By The Contractor And Developed On The Basis Of The Bill Of Quantities Attached To The Specification Of The Terms Of The Contract. After The Completion Of The Subject Of The Contract, The Contractor Is Obliged To Prepare And Transfer To The Employer The As -Built Cost Estimate, Which Will Take Into Account The Scope Of The Work Performed And The Actual Costs Of Their Implementation. This Cost Estimate Should Be Prepared On The Basis Of Data Contained In The Energy Audit Of The School Building.C.C) Obtaining A Permit To Use The Building On Behalf Of The Contracting Authority5) The Subject Of The Contract Must Be Carried Out In Accordance With Applicable Guidelines In Terms Of The Implementation Of The Principle Of Equal Opportunities And Indisclication, As Well As The Principles Of Equal Opportunities For Women And Men, Including Availability Standards For Disabled People. The Contractor Should Include The Provisions Of Art. 6 Of The Act On July 19, 2019. On Ensuring Accessibility To People With Special Needs (I.E. Journal Of Laws Of 2022, Item 2240, As Amended). 6) In The Implementation Of The Investment, A Marking Will Be Made To Ensure Accessibility Within The Meaning Of The Act Of 19 July 2019. On Ensuring Availability To People With Special Needs (I.E., Journal Of Laws Of 2022, Item 2240, As Amended). 7) Listed In Any Part Of The Description Of The Subject Of The Contract, Brand Or Origin Of Products Or Materials, Are Not Obligatory For Contractors. Contractors Have The Right To Offer Other Equivalent Products Or Materials Provided That Technical, Technological, Utility And Quality Parameters Are Ensured, At Least Meeting Or Exceeding The Parameters Of Products Or Materials Required In Swz Or Attachments To Swz. The Obligation To Prove The Equivalence Of The Products Used, Materials, Etc. Will Rest With Th
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.