Tenders Are Invited For Footbridge Via Bečvu At The Technical School In Vsetin Ii

Tender Detail

99732328
P25V00006806
Self-Funded
Tenders Are Invited For Footbridge Via Bečvu At The Technical School In Vsetin Ii
NCB
Eastern Europe
European Union
22-08-2025

Work Detail

The Construction Of A New Footbridge Connects The City Center With An Industrial School And A Swimming Pool. In The Riverbed Of The River There Is A Pylon On The Right Bank. The Whole Bridge Of The New Footbridge Is At Least 0.5 M Above Q100. The Footbridge Is Accessible From Both Banks For The Building Mechanization. The Passage Profile Is A Variable Width, At Least 4.0 M. The Footbridge Consists Of A Concrete Bridge Deck Suspended On The Outer Edges On Two Transverse Sloping Cables Anchored In The Deck And A Single -Column Pylon. The Longitudinally Inclined Pylon, Which Is Situated On The Right Bank Of The River, Is Anchored 2 X 2 Cables Anchored In The Wings Of The Supports. The Pylon Is Situated In The Axis Of The Bridge Deck, Which Therefore Has A Variable Width. The Footbridge Is Crossing The River And Its Leveling Is In The Top Bending Arch. Since The Bridge Deck Is Watered On Both Sides, The Suspension Cables Are Anchored To The Deck And The Anchor Cables Are Anchored To The Wings Monolithically Connected To The Abutments, And This Construction Also Creates An Economical Integrated Design System Without Bearing And Dilatation Conclusions. The Load -Bearing Structure Will Be Provided Directly With A Walkable Waterproofing Spatula On The Upper Surface. 10 Mm With Roughening Sprinkle. At The Outer Edges Of The Load -Bearing Structure, A Railing With A Vertical Pad For Pedestrians With A Handle At A Height Of 1300 Mm Is Designed. The Surface Of The Footbridge Is Continuously Illuminated By Led Lights Situated In Handles. The Pylon Is Illuminated By Two Lines With Led Strips That Will Be Situated On Both Sides In The Longitudinal Direction Of The Bridge To Highlight The Obstacle In The Passage Of The Space. Two Lines With Lighting Are Designed On The Lower Nk Ceiling. The Bridge Foreground Will Be The Foothold Walls That Will Be Lined With Stone Or Gabion Tiles Due To Large Height Differences. The Surfaces Will Be From Interlocking Pavement Without A Phase. The Lighting Is Designed Using Low Lighting Posts. The Contracting Authority Points Out That To Install Led Lights In The Handles Of The Railing, The Supplier Will Use The Light That Already Has The Client Available. This Is Also Taken Into Account In The Project Documentation.

Key Value

Tender Value
7,20,00,000 - CZK

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail