1) Part 1 Renovation Of The Municipal Road Located On Plots Of Land No. 223/2, 222/18, 222/17 Geod. 0005 Homesteads • Measuring Works • Deviating At The Expansion • Demolition Works Regarding The Existing Aggregate Surface • Earthworks • Mechanical Grubbing Of Medium Density Of The Bushes And Lining • Profiling And Thickening Of The Existing Foundation • Making A Foundation From Broken Aggregate 0/31.5 C90/3 F9 Se Min. 35 With A Thickness After A Thickening Of 20 Cm • Sprinkling The Aggregate Layer With Asphalt Emulsion • Ac 16 W 50/70 Kr1-Kr2 Gr. 5.0 Cm • Sprinkling Asphalt Emulsion Of The Binding Layer • Ac Layer Ac 11 S 50/70 Kr1-Kr2 Gr. 4.0 Cm • Roadside From Broken Aggregate With A Thickness Of 15 Cm • Vertical Adjustment Of Existing Underground Devices Sinks • Altitude Adjustment Of Existing Sanitary Sewage Wells • Congressing And Reaching Facts With A Surface Of A Mineral And-Asphalt Mixture3. The Subject Of The Contract Is Described In Detail In: A) Project Documentation. The Documentation, Which Is An Attachment To Swz, Contains: • Technical Design • Technical Specifications For The Execution And Acceptance Of Construction Works, B) The Bill Of Quantities, Which Is An Attachment To Swz. The Billioned Works Of Works Is Only Informative. The Contractor, After Reading The Design Documentation And Other Documents, Is Obliged To Determine The Scope Of Works Necessary To Achieve The Result. 4. If The Contractor Finds That The National Standards Or European Standards Used In Swz And In The Attachments May Indicate Product Manufacturers Or Sources Of Their Origin, The Contracting Authority Allows Equivalent Solutions In This Respect. This Means That The Technical Parameters Of The Products Indicated In This Way Specify The Minimum Expectations Required By The Employer To Be Used To Perform The Subject Of The Contract. In Addition, In Each Case, The Statement That The Description Or Feature Of The Product Described, Which May Indicate The Source Of Origin Or Manufacturer, Is Also Entitled To Use Equivalent Products, Which Are Understood By Those That Have Technical Parameters No Worse Than Those Indicated In Swz And/Or In The Attachments To Swz. It Is Also Allowed To Demonstrate This Equivalence Of Standards Equivalent To Those Indicated In Opz Or Commonly Applicable. The Contractor Has The Burden Of Equivalence. When Choosing Equivalent Materials, The Contractor Is Also Obliged To Ensure The Achievement Of Indicators Specified In Opz.5. The Contracting Authority Based On Art. 95 Para. 1 Of The Public Procurement Law, It Requires That The Contractor Employ All Physical Workers Directly Related To The Performance Of Construction Works Constituting The Subject Of This Contract Throughout The Entire Implementation Period. The Number Of Employees Necessary To Perform The Subject Of The Contract Is Determined By The Contractor Taking Into Account The Deadline And The Complexity Of The Project Documentation. The Contractor Is Entitled To Introduce Addi
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.