Tenders Are Invited For Energy Modernization Of The Main Headquarters Of The Grodzisk Mazowiecki Commune Culture Center Co -Financed By The National Plan Of Reconstruction And Increase.
Tenders Are Invited For Energy Modernization Of The Main Headquarters Of The Grodzisk Mazowiecki Commune Culture Center Co -Financed By The National Plan Of Reconstruction And Increase.
The Subject Of The Contract Is The Execution Of Installation And Construction Works Of Thermomodernization Of The Public Cultural Center In The Grodzisk Mazowiecki Commune At 9 Spółdzielcza Street, As Part Of The Energy Modernization Of The Main Headquarters Of The Culture Center Of The Grodzisk Mazowiecki Commune Co-Financed By The National Plan Of Reconstruction And Increasing Resistance As Part Of Investment B1.1.4 Strengthening The Energy Efficiency Of Local Facilities Social Activity. 2. The Order Includes In Particular: 1.1. Renovation Of A Heat Source Based On Newly Designed Gas Absorption Heat Pumps And Condensing Boilers. 1.2. Reconstruction And Extension Of The Gas Installation Supplying Newly Designed Heat Pumps And Condensing Boilers. 1.3. Renovation Of Central Heating Installation, Technological Heat And Hot Utility Water. 1.4. Renovation Of Ventilation And Air Conditioning Installations. 1.5. Execution Of A Solar Installation And Replacement Of Electrical Installations. The Investment Price Is To Achieve A Reduction In Primary Energy Consumption In The Building Of The Cultural Center By At Least 30%, Reduction Of Greenhouse Gas Emissions And Air Pollution. Note: The Contractor Shall Submit To The Ordering Party Within 14 Days From The Date Of The Contract From The Date Of The Contract, The Offer Cost Estimate And Material And Financial Schedule, Which Will Apply To All Works Covered By The Subject Of The Contract. The Offer Of The Offer And Schedule The Contractor Will Perform At Least The Conditions For The Works Specified In The Documents For The Tender Proceedings. The Offer Cost Estimate And Schedule Will Be Consistent With Each Other, As Well As With Methodology, Measurement Units And The Names Of Works Appearing In The Project Documentation. The Cost Estimate Should Be Made Using The Detailed Method. On The Title Page, The Unit Price Of Labor, Bedspreads And A Summary Should Be Provided. The Offer Cost Estimate Is A Document That Will Be Used To Determine The Due Remuneration Of The Contractor In The Cases Specified In The Contract, Is An Auxiliary And Does Not Affect The Type Of Remuneration (Flat -Rate Remuneration). 2. The Detailed Description Of The Subject Of The Contract Is Presented By Opz, Which Is Annex 9 To Swz And Design Documentation Constituting Annex No. 10 To Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.