The Scope Of The Subject Of The Contract Includes The Execution Of N/In Construction Works: Reconstruction Of The Internal Municipal Road Ul. Cicha In The Town Of Równe (Journal Of Laws No. 482 Obręb 0016 Equal). Investment Provides For The Reconstruction Of The Internal Road Ul. Cicha In A Town Of 4.0 ÷ 4.5 M 200 M Wide, For Which: 1) Making Asphalt Concrete Roads With A Width Of 4.0 ÷ 4.5 M With An Estimated Area - 858 M2. Construction Of The Municipal Road Road: - Abrasive Layer - Asphalt Concrete Ac11s 50/70 - Gr. 4 Cm, - Binding Layer - Asphalt Concrete Ac16w 50/70 - Gr. 5 Cm,- Upper Layer Of Broken Aggregate 0/31.5 Mechanically Stabilized Gr. 15 Cm,- Foundation Layer (Widening) From A 4/63 Mm Concrete Aggregate Stabilized With A Thickness Of 20 Cm,- Profiled And Compacted Substrate. 2) Execution Of Individual Conventions With An Estimated Area: 54 M2construction Of Individual Congresses:- Upper Layer Of Broken Aggregate 0/31.5 Mechanically Stabilized With A Thickness Of 8 Cm,- Lower Layer Of Concrete Aggregate 4/63 Mechanically Stabilized With A Thickness Of 15 Cm- Profiled And Concentrated Substrate. 3) Roads Of Roadside 0.50 M With An Estimated Area: 200 M2construction Of The Roadsides:- Broken Aggregate 0/31.5 Mm Mechanically Stabilized With Gr. Layers 15 Cm,- Profiled And Compacted Substrate. (Excavations, Embankments),- Humus And Sowing With A Mixture- Low Greenery,- Tidying The Construction Site,- Protection Of Telecommunications Line With Arot Shielding Pipes,- Vertical Adjustment Of The Wells For Water Supply Valves- Replacement Of Boxes With Altitude Adjustment. The Semi-Scope Of The Order Is Determined By Design Documentation, Pre-Flag. Works. Additional Information That Should Be Included In The Execution Of The Contract:- For The Duration Of The Works, Secure And Mark The Place Of Conducting Works,- Possible Need To Enter The Plots Owned By Other Persons Should Be Agreed Before Starting Work,- The Order Should Be Made From Own Materials Approved For Use In Construction Under Construction Under The Construction Law And Using Your Own Equipment,- Geodetic Service (Geodetic Service (Geodetic Service (Geodetic Service And A Geodetic As-Built Inventory) Lies With The Contractor,- Before Starting Work, It Is Absolutely Necessary To Develop And Agree The Project Of Temporary Traffic Organization During The Duration Of The Works, Which Is A Necessary Condition For The Commencement Of Works,- After The Works Performing The Works, The Area Should Be Restored To A State Not Worse Than Before The Commencement Of Work.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.