Pursuant To Swz: 2.1.3. Subject Of The Contract: Modernization Of The Structural Network - O/Ostrów Wlkp., Ul. Wysocka. (...) 2.1.5. The Detailed Description And Scope Of The Subject Of The Contract Includes Annex 1 To Annex 9 To Swz.2.1.6. Solutions Equivalent: 2.1.6.1. The Subject Of The Contract Was Not Described In The Manner Referred To In Article 99 (5) By Indicating Trademarks, Patents Or Origin, A Source Or A Special Process, Which Is Provided By A Specific Contractor, 2.1.6.2. Pzp: 2.1.6.2.1. Employment Requirements: 2.1.7.1. According To The Regulation Contained In Art. 95 Para. 1 Of The Public Procurement Law, The Contracting Authority Requires During The Performance Of The Contract, Throughout The Entire Period Of Performing The Activities Entrusted To Them, Employment By The Contractor Or Subcontractor, Based On An Employment Relationship, In Full -Time Working Time (Full -Time), Within The Meaning Of The Labor Code And For Remuneration Of Not Less Than The Minimum Remuneration For Work, Determined Pursuant To Art. 6-7 Of The Act On Minimum Wage For Work - Persons Performing Activities Consisting In: 2.1.7.1.1. Installation Of Cable Routes, Switchgears, Etc.; 2.1.7.1.2. Drilling/Piercing Holes In The Walls; 2.1.7.1.3. Laying Of The Network And Power Wiring; 2.1.7.1.4. Assembly Of Electrical Devices; 2.1.7.1.5. Installation Of Air Conditioning Installations; 2.1.7.1.6. Installation Of Security Systems In Pd And Ups Rooms; 2.1.7.1.7. Disassembly Of The Old Network And Electrical Installation; 2.1.7.1.8. Dismantling Old Electrical Devices, Cable Routes And Switchgears; 2.1.7.1.9. Dismantling The Old Air Conditioning Installation; 2.1.7.1.10. Performing Research Of Network Parameters; 2.1.7.1.11. Ordering The Place Of Works, 2.1.7.2. Detailed Determination Of The Method Of Verification Of Employment Of Persons As Well As The Rights Of The Employer In The Scope Of Controlling The Contractor Meeting The Requirements Related To Employing Persons And Sanctions For Failure To Meet These Requirements - Includes Annex 9 To Swz.2.1.8. Warranty And Quality Guarantee: 2.1.8.1. Required Period: 2.1.8.1.1. Warranty In Terms Of Defects Of The Completed Subject Of The Contract - 60 Months; 2.1.8.1.2. Quality Guarantee For The Performed Subject Of The Contract - 60 Months, 2.1.8.2. The Terms Of The Warranty And Quality Guarantee Were Specified In Detail In Annex 9 To Swz. (...) 2.1.10. The Terms Of The Order Processing Were Specified In Detail In Annex 9 To Swz. The Other Information Can Be Found In Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.