1. The Subject Of The Order Is: Renovation Of The Boiler Room Room And Construction Of An Internal Gas Installation In The Building Of The Health Center In Jakubów. 1. The Subject Of The Contract Is The Implementation Of The Investment Task Consisting In The Renovation Of The Boiler Room In The Building Of The Health Center In Jakubów, While Performing The Internal Gas Installation, Ul. Mińska 9, 05-306 Jakubów. 2. The Scope Of Work Includes: • Dismantling In The Building Of The Health Center (Central Heating Boiler Room) Of A Steel-Water Heating Boiler With A Domino-P Tank On An Eco Pea With An Area Of 3.5 M2 With A Part Of The Internal Central Heating Installation, Electrical And Ventilation Installation, • Mounting A New Condicted Gas Boiler-1 Piece, With A Part Of The New Central Heating Installation, New Vessel Expansion Expansion Panetic Pressure Valves, Safety Valves, Return Valves, Cast Iron Valves, And A New Steel Chimney With A Diameter Of 80 Mm, • Execution Of An Internal Gas Installation, Which Should Be Equipped With The Following Gas Supplies:- Gas Boiler With A 3/4 Bulk Cock With A 3/4 Cutting Tap With 30 Kw X 1- Gas Kitchen With A Ball Curator 1/2 1/2 Bandwidth Up To 10 M3/H, And G-4 Gas Meter Mounted In An Existing Type 1 Cabinet With Dimensions Of 600X250x800 Mm, Located On The Facade Of The Connected Building And Three G-1,6 Gas Meters Installed At Residential Premises That Are Located On The First Floor Of The Building. Before Installation Works And Boiler Replacement, The Boiler Room Room Should Be Renovated, Which Includes: • Replacement Of The Entrance Door-2 Pieces, On The Door In The Ei30 Class, • Ventilation Grilles, • Construction Of Part Of The Water-Sewage Installation With The Assumption Of A New Sink, Batteries, • Making A New Electrical Installation With The Assumption Of New Lighting Lamps, Sockets, Switches, With Appropriate Measurements, • Improvement Of Internal Plasters, Painting With Emulsion Paints, • Location Of Stoneware Plates With Earlier Preparation Of The Floor With Plinics, • Putting On A Steel Radiator With A Tightness Of Central Heating Inst. Carry Out The Required Inspections, Tightness Attempts Of Built Gas Installations, • Chimney Collection Of The Boiler Installation And The Air Supply System And Exhaust Gas Drainage System, • Train (Instruction) Of Installation Users With The Principles Of Proper Operation, Use, Maintenance And Safety Related To The Use Of A Gas Boiler, • Prepare And Deliver Complete Udt Documentation With The Delivery Of Equipment. The Local Office Of Technical Inspection And Participate During The Revision And Receipt Of These Devices During The First Registration, • Remove At Your Own Expense All Defects And The Elements Of The Boiler Room, Its Equipment And Other Supplied Devices That Occurred During The Registration Of These Devices, • Make The As -Built Documentation And Operating Guidelines For The Employer Regarding The Built -In Equipment, Submitting To The Customer, S