The Subject Of The Contract Is: Successive Delivery Of Food Products For The Needs Of Pcapow In Kędzierzyn-Koźle For 12 Months-3 Parts Of The Order Of The Order Is The Successive Delivery Of Food Products For The Needs Of The Poviat Administrative Center Of Care And Educational Institution Attachments 1 ÷ 3. The Entire Order Was Divided Into Three Parts Of The Order, I.E. Part 1 - Meat And Sausages. Part 2 - Frozen Vegetables And Fruits, Fish And Fish Products, Flour Products And Ice Cream. Part 3 - Other Foodstuffs 1 - Meat And Sausage. Description Of The Subject Of The Contract Is Determined By The Assortment And Price Form Annex 1 - Constituting An Integral Part Of Swz Published On The Published On The Page Of The Proceedings: Https://E-Propublico.Pl/Ogloszenia/Details/0E4e9548-F86f-4E7e-872D-1D651ee1888a 1. The Subject Of The Contract Are The Successive Delivery Of Foodstuffs Intended For The Purposes Of Current Nutrition In The Assortment And Quantities Included In The Statements Constituting Attachments No. 1 To No. 3. The Employer Points Out That Cyclical Deliveries To The Ordering Entity Should Be Adapted To The Placed Order Each Time. 2. The Contracting Entity Reserves The Right To Limit The Scope Of The Order In Individual Parts, While Maintaining The Minimum Value Of The Subject Of The Contract (Specified In The Concluded Contract) At The Level Of 10% Guaranteeing The Contractor Related To This Scope Of The Contract Remuneration. A Certain Number Of Foodstuffs In The Price Form Is An Estimate And May Change (Reduced Or Increase) During The Performance Of The Contract. The Above May Not Constitute Grounds For The Contractor To Bring Claims For The Purchase Of The Remaining Number Of Products Or For Payment Of The Equivalent Of Unimpressed Products Or Compensation For Their Failure. 3. Food Products Covered By Delivery Should Meet The Current Sanitary And Epidemiological Requirements And Haccp System Principles In Collective Nutrition Plants, Among Others: 1) Have Adequate Quality Specifications Or Approvals, 2) Have The Appropriate Marking, I.E. The Date Of Minimum Durability And The Date Of Shelf Life, 3) Have The Appropriate Temperature During Transport And Sanitary Conditions Of The Vehicle. And The Contractor Must Have Current Required Decisions Related To This. In The Event That Any Of The Previous Decisions Have Expired Or Have Been Withdrawn During The Period Of This Contract, The Contractor Is Obliged To Submit A New Decision In This Respect, No Later Than On The Last Day Of The Current One. Lack Of Any Required Document Confirming The Possession Of The Appropriate Valid Decision Or Failure To Complete The Documents Within The Deadline Set By The Entity, Will Constitute The Basis For Withdrawing From The Contract By The Contracting Entity With Immediate Effect And Calculating The Contractor Of The Contractual Penalty Referred To In § 10 Paragraph 1 Point 1.1 Of The Ppu Or Depending On The Decision Of The Contracting Entity To Su
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.