Repair And Maintenance Services Of Audio-Visual And Optical Equipment-T-263/24 In Tram Operation. Operation Of Camera Systems Mounted In T5c5k2, Tw6000 And Tw6100 Electric Vehicles, Entrepreneurial Contract (Service Order) Total Quantity (Planned): 2550 Pieces, 80 Hours/24 Months Details Of The Price Table And Technical Requirements Are Included In The Technical Requirements. The Quantities Given In The Flood Table Were Determined On The Basis Of Previous Use Experience, So -Called. Experience Quantities. Experience Quantities Have Been Granted To Determine The Tenders For The Validation Of The Bids Without The Value Of The Sales Tax, And The Quantities Obtained Under The Contract May Differ From These Experiential Data. The Tenderer Must Submit His Tender In The Light Of The Above. Only Unit Prices Are Indicated In The Annex To The Contract To Be Concluded. The Contracting Authority Undertakes 70%Of The Amount To Be Recorded In The Framework Contract. The Contracting Authority Draws Attention To The 321/2015. (X. 30.) Government Decree 46 (3). The Contracting Authority Requires The Contractor Or The Subcontractor Carrying Out The Service As A Contract For The Contract. (Hereinafter: Vtv.) A Member, Employee, Or, If The Activity Does Not Carry Out The Activity, A Person Working In Favor Of The Successful Tenderer (Hereinafter Referred To As A Specialist). 5/A. (1) (A). In The Event Of The Winner Of The Tenderer, The Specialist Shall Submit The Specialist By The Time Of Conclusion Of The Contract. 5 (1) (A) A Copy Of The Designation Of The Design And Assembly Certificate Of The Property Protection System. • Vtv. 5/A. (1) (B), A Liability Insurance Contract For A Property Protection System. In The Event Of The Winner Of The Tenderer, He Must Submit A Copy Of The Liability Insurance Contract By The Date Of Conclusion Of The Contract. The Contracting Authority Shall Inform The Tenderers That If The Contracting Authority Does Not Submit A Copy Of The Required Property Protection System And/Or The Liability Insurance Contract Until The Contract Is Concluded, The Contracting Authority Is Entitled To Consider This Circumstance Not To Comply With The Contract. Pursuant To Article 131 Para. The Tenderer Must Declare In His Tender That: • Undertakes To Perform In The Schedule Requested By The Contracting Authority And In The Quantity Of Orders; • Has The Repair Of Sa
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.