Maximum Pressure-240 M, Throughput-35 Cubic Meters. M/H, Network Voltage-380 ~ 400 V, Electric Motor Power-18.5 Kw, Current Frequency-50 Hz, Maximum Temperature Of The Pumped Liquid-90 ° C, The Maximum Temperature Of The Environment- 40 ° Capitalium-Chigun, In The Place Of Equipment, Will Provide Operational Manual, Certificate, Guarantee Coupon, Provide A Sheet Of Germ The Planned Supply Of Material (Equipment), Unloading Of Goods In The Warehouse Of The Customer Is Carried Out By The Firmi For The Crew Gost 28703-2016, Type Surface Pumping Station Of Absorption Depth Of 8 M Maximum Pressure 41 M Throughput 4.7 Cubic Meters. M/H, The Network Voltage 220/230 V Power Consumption Of 850 W Rated Power 560 W Functions Protection From Overheating Water Water Quality Pure Fluid Temperature Up To 40 ° C. Hap Material Stainless Steel Model -Free Volume Of The Outgoing Hole (G) 1½ ″, 1 ″ Network Cord Length 1.5 M Installation Installation Horizontal Pump Provide Passport, Warranty Coupon, Screening Sheet For The Planned Supply Of Material (Equipment) Unloading The Goods At The Customer’S Warehouse Is Carried Out By The Faster Of Gost 17398-72, Water Quality Is Dirty, Clean Throughput, Cubic Meter. M/ H 25 Power Consumption, Kw 3 Maximum Pressure, M 20 Depth Of Immersion/ Absorption. M 7 The Permissible Water Temperature, C +35 Type Of The Water Passes Provide Passport, Warranty Valon, Reservation Sheet For The Planned Supply Of The Material (Equipment) Unloading Of The Goods In The Customer’S Warehouse Is Carried Out By The Outsurger Gost 31839-2012, Antartic Diameth- 25Mm. The Maximum Pressure Is 4-6 M. The Temperature Of The Pumped Environment Is From +2C To +110C. Power Consumption- 25-90W. In Place From The Equipment, Will Provide A Passport, Operating Manual, Certificate Of The Warranty Coupon Provide A Sheet Of Screening For The Planned Supply Of Material (Equipment) To Unload The Goods At The Customer’S Warehouse Is Carried Out, Conditional Diameter Is 32Mm. Max. Exhibition-3 ... 6M3/H. Environmental Temperature +40S. Power Consumption- 25 ... 100 Watts In A Place With Equipment Will Provide A Passport, Operating Manual, Certificate Of Guarantee Talon To Provide A Sheet Of Screening For The Planned Supply Of Material (Equipment) Unloading The Goods At The Customer’S Warehouse Is Carried Out By The Fasting Of Gost 28703-2016, The Conditional Diameter Is 150Mm / 125 Mm. The Diameter Of The Operating Wheel Is 315 Mm. The Rotation Frequency Of The-1500 Rpm. Operating Pressure-6-10 Bar. The Temperature Of The Pumped Environment Is 0 S ...+105P. The Power Of The Electric Motor-18.5 ... 55 Kw. In The Place Of The Equipment, The Guarantee Manual, The Certificate Is The Warranty Talon. Provide The Sheet Of Deprivation For The Planned Supply Of Material (Equipment), Unloading Of Goods In The Customer’S Warehouse Is Carried Out By The Faster Gost P52743-2007, Churches D-40 Mm Pump Voltage 220 V, Capacity 370 W, Manufacturer 126 L/Min Type Of Drive Electric Drive, Wednesday Temperature (Max) 110 Bridge 28703-2016 In Place With Equipment Will Provide A Passport, Operating Manual, Certificate Of Warranty Coupon Provide The Approval Leaves For The Planned Delivery And Unloading Of The Goods In The Customers Wire Produced On Its Own At The Expense Of The Supplier, The Pump For Pumping Stove Fuel Is Explosion-Assigned Model-50Nrv-20A. Productivity Is 20 M3/Hour. Highness Height Is 7 Meter. Pressure- 20 Meters. The Diameter Of The Attached Sleeve (Hose) Is 50Mm. Power Consumption-2200 Watts. Operating Temperature Range: - 40 +50 C. The Temperature Range Of The Pumped Environment: -40 +80 C. In The Place Of The Equipment, It Will Provide A Passport, Operating Manual, Certificate Of Guarantee Talon. Provide A Sheet Of Scum For The Planned Supply Of Material (Equipment) Unloading The Goods At The Customer’S Warehouse Is Carried Out, Voltage 220 V, Capacity 550 W, Manufacturer 216 L/Min 13 M3/H The Type Of Drive Electric Drive, The Temperature Of The Medium (Max) 110 S In The Place With The Equipment Will Provide A Passport, Operating Manual, Certificate Of Guarantee Coupon For The Planned Supply Of Material Delivery And Unloading Of Goods In The Customer’S Warehouse Is Carried Out On Its Own At The Expense Of The Gost Supplier At The Expense 28703-2016