Motobomba Renewing: Pumpting-S40r-06 710/6 Internships / Motor Power-15Cv 380V. Motor-9Cv/380V., General Maintenance In Command Board 440V, Maintenance In Submersible Motobomba Tsbl Trif, 23/07/2025, Maintenance Syimples In Control Board, Submerged 6 Lion: Pump-S40r-06 710/6 Stages/Engine Power-15Hp 380V. -S40r-08 710 /8 Internships / Power Moto-20Cv / 380V. Contactor Cwb 25A 220V, 22A 32A Overload Relay, Phase Failure Relay 380V., 1 To 30 Timer Relay 220V, 50A Din Trifth Trifth Circuit Breakers, 32A Din Circuit Breakers, 16A Din Single -Phase Circuit Breakers 220V Digital Voltmeter 220V, 220V Signs 220V, 220V Red Synadus, 220V Yellow Squad, Red Emergency Button With 1 No, Ventilated 40X40x2mts Gray, Table Track Bar, Sak 10Mm Borne, 16Mm Borne, Sak 4Mm Borne, 40A Tremphasic Engine Breakouts, 25A Three -Phase Engine Circuit Breakers, 40X50x20 Assembly Frame. With Flange, 1/2 Cable Press, 3/4 Cable Press, Cable 1 Cable Press, 1Mm Gray Flexible Cables, 1/2 Insulating Aspiral, Blue Blue Bread, 2 -Pink Pipes, 2, Galvanized Globanized Gloves 2, Nyps Galvanized 3, Horizontal Valve Nyps, Nyps Gloves, Nyps Gloves. 3, 2X3/4 Horizontal Retention Valves, 3X1 Galvanized T Galvanized 90X3 Curves, 90X2 Galvanized Curves, 21/2 X 2 Galvanized Reduction Bushings, 1/2 -Coated Wire Rope, 1/2 -Coated Wire Rope Connector With Drawer With Drawer 2, Metal Records With Drawers 3