Demolition Of The Cover And Ground: Asphalt-Concrete, Demolition Of Bort Stones: Concrete Basic, Installation Of Concrete Bort Stones: In Cement-Concrete Coatings, Pavement Reinforced Concrete Borders, Concrete B-25: H = 30 Cm, B = 15 Cm, L = 1 M, Construction Of The Grounds And Smoothing Layers: Sand-Gravel Mixture, From Large Sand, Gravel Mixture (A Piece Of Wrinkle, Gravel (Brush) -Gum), Construction Of A Cover With A High-Paced Large-Grained Boiling-Grained Boiling-Grainy-Grainy-Grainy-Growing Concrete Mixture, Density Of Stone Materials: 2.5-2.9T / M3, Construction Of A Cover With A Large-Grained Eu-Type Hot Asphalt-Concrete Mixture, Density Of Coating, To Add Or Exit The Thickness Of The Cover 0.5 Cm, To The Norm Of 27-06-020-3, The Capacity Of The Chapes Is 0.5 (0.5-0.63) With Excavators With Excavators With Excavators By Loading The Cars By Loading The Cars, Group: 1, Özuboshal Car Kamaz 66115, 2011, 15 T, Transportation Distance - 5 Km.1Th Grade Load, Fulfillment Of Work On The Ground In The Soil, Group Of Group: 2-3, Establishment Of Bases Of 40-70 Mm From The Thickness Of 15 Cm, 40-70 Mm Fractional Fractionation (Squeezing Resistance Limit) During The Habit Of Higher Stone Materials): Double, Lower
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.