GTR 99623773
Tenders Are Invited For R-3-25 Concrete Canal (Pk 27 + 50 + Pk 45 + 50, L = 1.8 Km) Overhaul Of Concrete Cover And Facilities
ICB — International Competitive Bid
Closed
Western Asia
Tender Information
GTR Reference
99623773
Tendering Authority
Subscribe to view
Tender No
115502
Financer Name
Self-Funded
Work Title
Tenders Are Invited For R-3-25 Concrete Canal (Pk 27 + 50 + Pk 45 + 50, L = 1.8 Km) Overhaul Of Concrete Cover And Facilities
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
30-07-2025
Closed
Work Detail
Manual Planning Of The Bottom And Slopes Of Channels Of Dancers, Ground Group: 2 (Manually Smoothing Of The Canals Bottom And Slopes), Freight Capacity, Which Operates Outside The Carer, Transporting Cargo To Cars, Transportation, Transportation Distance - 7 Km. 1St-Grade Load, Power In Natural Sleeping Soils 79 (108) Kwh (108) Kvt (A.G.) Cutting Of The Bushes And Sponses With Colands On The Tractor: Central, Demolition Of Concrete Monolithic Coatings (V = 1466X0.3), Construction Waste Loaded With Excavator Capacity By 0.5 M3: Downloading (Unusable Concrete Is 0.65 M3 Of The Capacity Of 0.65 M3 With An Ecasktors Cargo To The Ozbotheist To The Car), Loading Capacity 10 Ions (Code 400052) Pzubo-Al-Running Cars Outside The Career {Cargo Transportation, Transportation Distance - 5 Km. 1St-Grade Load, Establishment Of Channels And Dams With Birchalovs Excavators With 0.65 (0.5- P, 8) M3, Nrunt Team: 2 (0.65 M3 Of The Capacity Of 0.65 M3 Of 0.65 M3 Of The Canal Of The Existing Channel From The Lilt), Construction Of Dams, Dumps, Cuts Of Casts And Dry Cubes With More Than 16 T To The Large Number Of Tugs, The Capacity Of The Clique Is 0.65 (0.5-: 1) Iii3 With Excavators By Downloading The Igrunta By Loading The Cars, Group: 2, Dams, Shuts With The Low Parts Of The Lower Parts Of The Corporations, With More Than 16 T Thicknesses, Establishment Of Channels And Dams With Birçalovs Excavators With 0.65 (0.5- 0.8) M3, Group Of Group: 2 (Drilling The Project Cut), The Capacity Of The Clique Is 0.65 (0.5- 1) M3 With Excavators And Drilling The Group Of Group By Downloading The Group Of Group: 2, Construction Of Six Basics: Sandy, Construction Of Six Bases: Gravel, Bottom And Thickness Of The Bottom Of The Slopes With Monolithic Reinforced Cranes, Up To 12 Cm Of Caterpillar Cranes: 0.2 Rn (B12.5 (M-150) Correction Of 12 Cm Thick Coat (B) (B = L, 2 M, 5 M, T = 12 Cm))
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
bc80d8e6-e9d9-43bd-aceb-512445d83113.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.