Electrotechnical Equipment - Replacement And Modernization Of Secondary Systems In Ts Rovinj 110 Kv. The Subject Of This Procurement Is The Replacement And Modernization Of The Control System, Supervision, The Relay Sewing And Measurements Of 110 Kv Plants. The Subject Of This Procurement Is: • Development Of Project Documentation: To Replace The Control, Control And Relay Protection System Of 110 Kv Voltage Levels, To Replace The 110 Kv Voltage Level Measurement System, For The Network Infrastructure System Under The Jurisdiction Of Hops, For Telecommunications Equipment, • Disappointment Of Existing Secondary Equipment Cabinets Drawing And Disposal Of Old Cables, • Procurement And Installation Of New Closets Of Secondary Equipment For The Purpose Of Replacing And Modernization Of Secondary Control Systems, Surveillance, Relay Protection And Measurements Of 110 Kv Plants, • Procurement, Laying And Connection Of New Cable Connections From The Closet Of Secondary Equipment According To The Primary Facility, • Apparatus, • Parameter, Testing And Commissioning A New System Of Controls, Surveillance, Relay Protection And Measurements Of 110 Kv Plants, • Dismantling Existing Controls +S1 In All Fields And Cabinets +S2 On The Transformer Fields, • Disassembling Of The Zvezdište 110 Kv Transformers And Rigid Autumn. Voltage Branches On Water Fields And Measuring Fields Of 110 Kv Plants Sections, • Construction Arrangement Of The Room For Secondary Equipment Of The System 110 Kv, • Construction Work According To The Project Requirements, • Connectioned Locksmith Works According To The Demands Of The Project, All In Accordance With The Cost Of The Costs And The Entire Don, In Which The Name, Quantity And Other Conditions Are Required.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.