The Subject Of The Order Are Construction Works Involving The Performance Of A New Layout Of Sanitary Rooms By Separating Separate Sanitary Facilities For Girls, Boys And People With Physical Disabilities And For Teachers, In Particular: 1. Construction Works: Preparatory Works, Dismantling Works - Demolition (Partition Walls, Floors, Door Joinery), Masonry Works (Partition Walls Full Of Bricks, Prefabricated Lintels), Partition Walls Made Of Gypsum Boards, Mandatory Ceilings, Door Assembly, Plate, Installation Of Sliding Doors, Making The Expansion Layer On The Floor, Making A Floor Of Stoneware Tiles With Dimensions Of 30X30, Execution Of Pedestal, Wall Fencing, Pailing Walls, Installation Of System Walls From Hpl. Preparation Of Surfaces For Painting Old Plasters, Double Painting Walls Painting Acrylic, Installation Of Equipment (Soap Dispensers, Free -Standing Baskets, Toilet Brushes, Handles For The Disabled, Mirrors 40X70 Cm) 2. Electrical Robots: Dismantling Of The Electrical Installation With Utilization, Forging Furrows Under A New Installation: Lighting, Plug Sockets, Laying The Cables, Installation Of Installation Cans, Connecting The Cables To The Existing Installation - Power Supply From The Nearest Board, Making Furrows, Piercing, Piercing, Replenishing Plasters, Painting, Fan, Preparation Of The Substrate For Lighting Accessories, Installation Of Olw Connectors. P/T, Sensors Installation Of P/T Plug Sockets With Current Track Cover, Connecting The Installation To The Connector, Preparation Of The Substrate For Lighting Fixtures, Installation Along With Connecting Lighting Fittings, Electric Measurements. - Lighting Circuit, Circuit Of Plug Sockets, Execution Of Lighting Intensity, As -Built Documentation. 3. Sanitary Installation Works: Preparatory Works, Construction Works (Forging Horizontal And Vertical Furrows, Culverts Through Building Partitions, Wrecking Furrows) Works Of Ventilation Installation, Installation Of Channel Fans, Installation Of The Central Heating Installation (New Plate Heaters), Heating Fittings (Heads Thermostatic), Start And Adjustment Of The Central Heating Installation, Execution Of Drainage Cables From Sanitary Facilities, Installation Of Sewage Grooves, Replacement Of The Vertical, Replacement Of Hot And Cold Water Pipes, Replacement Of Sewage Pipes Sinks, Sink, Urinals), Making A Chimney Sweep Opinion, Starting Ventilation, As -Built Documentation Description Of The Subject Of The Contract Is Included In The Design Documentation Being Annex 9 To Swz.