Tenders Are Invited For Renovation Of The Baths And Sanitary Rooms In The E And F Pavilions In The External Branch And The D Pavilion At The Prison In Sieradz. Proceedings No. 2
Tenders Are Invited For Renovation Of The Baths And Sanitary Rooms In The E And F Pavilions In The External Branch And The D Pavilion At The Prison In Sieradz. Proceedings No. 2
The Investment Will Consist In The Renovation Of The Sanitary Rooms Of The D Pavilion Located On The Ground Floor And Floor Of The Building. On The Ground Floor, The Range Of Renovation Will Include Dressing Rooms, Baths, Washrooms, W-C With A Vestibule, And On The First Floor Of The Laundry, Washroom And W-C With A Vestibule. As Part Of The Renovation, It Is Also Expected To Replace Windows In The Above -Mentioned Rooms. In The E And F Pavilion, The Space And W-C Will Be Covered By The Range Of Renovation. A Detailed Description Of The Work Was Included In The Design Documentation. 45000000 -7: Construction Works71000000-8: Architectural, Construction, Engineering And Control Services 45.11.11.00-9: Works In The Field Of Destroying 45.11.12.20.06 Works In The Field Of Removing Debris45310000 - 3: Works In The Field Of Electrical Installations45410000 - 4: Plastering45442100 -8: Painting Robots45432110 -8: Putting And Putting In Floors45330000 -9: Water And Sewage And Sanitary Installation Works45320000 -6: Insulation Works • Works In Accordance With Design Documentation, While Maintaining The Conditions Arising From Technical Standards And Acceptance Of Construction Works, In Accordance With The Principles Of Technical Knowledge And Requests Resulting From The Relevant Legal Provisions. • Ensuring The Personal Staff Required By Law In The Form Of The Authorized Manager Of Demolition Works And Other Persons Necessary For The Implementation Of The Task, • During The Implementation Of The Contract, The Contractor Is Obliged To Participate In Working Consultations And Make Current Arrangements With The Employer, • Performing By The Contractor All Preparatory Work Related To The Health And Safety Requirements, Organization Of The Construction Site. The Contractor Is Responsible For Ensuring Safe Conditions At The Construction Site And In Its Surroundings. , Item 1887, As Amended), In The Amount Of 10% Of Employees Carrying Out The Subject Of The Contract • The Date Of The Renovation Work: Until December 22, 2025.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.