Tenders Are Invited For Modernization Of The Bridge Over The Biała River Along The Municipal Road Connecting Journal Of Laws No. 317/5 (Ul. Łąkowa) And Journal Of Laws No. 469 (Internal Road)
Tenders Are Invited For Modernization Of The Bridge Over The Biała River Along The Municipal Road Connecting Journal Of Laws No. 317/5 (Ul. Łąkowa) And Journal Of Laws No. 469 (Internal Road)
The Subject Of The Contract Is The Modernization Of The Bridge Over The Biała River Along The Municipal Road Connecting, Journal Of Laws No. 317/5 (Ul. Łąkowa) And Journal Of Laws No. 469 (Internal Road). The Bridge Modernization Is Expected To: • Renovation Of The Bridge, Abutment And Access To The Object; • Execution Of New Paving Caps With Barriers; • Seizure Of Concrete Pavement And Giving New Declines Through The Layer Of Pcc On Which Bituminous Insulation Will Be Made; • Making A New Bituminous Surface; • Performing A New Anti -Corrosion Of Steel Beams Along With The Purification Of Concrete Surfaces With Reprofization And Protection With A Hydrophobizing Coating; • Replacement And Supplementation Of The Brushwood Embankments With Backfill; • Installation Of Measuring Signs In The Form Of Cast Iron Repects Embedded In Holes Using Materials Based On Epoxy Resin; • Installation Of Steel Energy -Consuming Barrier H2/W3/A • Regulation And Strengthening After Installing Geodetic Repects, The Final Geodetic Measurement Should Be Carried Out, Which Should Be Attached To The As -Built Documentation, The Investigation Of The Object Does Not Change. The Load Capacity Of The Bridge Remains Unchanged. The Width Of The Bridge And Its Length Remain Unchanged. The New Platform Will Have A Separate Width Of One Car Lane And Two Pavement Caps. In Order To Ensure Access To The Property, The Repair Of The Platform Should Be Carried Out Half. The Bridge Renovation Project Provides For The Following Main Stages Of Works: • Preparatory Works. • Demolition Works Of Existing Balustrades, Pavement Kap, Milling Of Concrete Platforms. • Demolition And Matching Of Handrails / Balustrad / Along Łąkowa Street Access /Reconstruction Of The Surface On Both Sides /Contractor As Part Of Preparatory Works Will Obtain The Reconciliation Of The Project And Will Agree On Its Technology Of Renovation With Polish Waters. The Contractor As Part Of The Task Will Prepare, Agree And Implement A Temporary Traffic Organization During Renovation And The Destination Of The Movement. The Subject Of The Contract Was Described In Detail In The Project Documentation - Constituting Annex 10 To Swz
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.