1. The Subject Of The Contract Is The Implementation Of The Task Entitled: Changing The Method Of Heating Residential Premises (Vacancy) Together With Their Modernization - Renovation Of Residential Premises In Piła At Powstańców Wielkopolski 9/11 And 9/12 2. The Contractor Should Meet The Subject Of The Contract In Accordance With Applicable Regulations And Standards, To The Extent And In A Way Specified In Detail In The Documentation, Technical Specifications Of The Execution And Acceptance Of Construction Works And Other Documents Constituting Attachments To This Swz 3. The Scope Of Construction Works Includes, Among Others, Powstańców Wielkopolskich 9/11A) Replacement Of Wooden Box Window Joinery With Pvc With Window Sills, B) Installation Of Diffusers At The Top Of The Window (1 Diffuser Per 1 Room With A Window) C) Replacement Of The Door Joine Ceilings, F) Downloading Old Wallpapers From The Walls, G) Priming, Plastering, Painting Walls And Ceilings, H) Topping Up The Plaster), Formed Old Wall Tiles, J) The Location Of Ceramic Tiles On The Walls And Floor In The Kitchen And Bathroom, K) Disassembly Of The Tiled Stove, L) Disassembly Of Pvc Lodges On The Floor And Skiplogs, Ł) Nailing Osb Boards To Level The Floor, M) Installation Of Floor Panels And Pvc Floor Coverings And Skirting Boards, N) Placing Partition Walls From G-K To Separate The Bathroom, O) Making The Door Opening In The Bathroom And Installation Of Door Joinery, P) Department Of Debris, R) Implementation And Hanging An Information Board On The Building, S) Development Of The Internal Extension Project Gas Installation, T) Execution Of A Central Full -Time Heating System With Radiators, U) Assembly Of A Two -Function Gas Boiler In Accordance With Pt, V) Installation Of A Toilet Bowl, Sink, Sinks, Bathtubs, W) Replacement Of A Four -Liter Gas Cooker With Oven, X) Water Meter Assembly, Y) Making The Level Of Sanitary Sewage System With Pvc 110, Z) Chimney Insert Into A Gas Boiler, Aa) Replacement Of Electrical Installation With The Supply Of Electrical Protocols, Bb) Execution Of The Energy Performance Certificate. 2) Al. Powstańców Wielkopolskich 9/12A) Replacement Of Wooden Box Window Joinery With Pvc Together With Replacement Of Window Sills, B) Installation Of Diffusers In The Upper Part Of The Window (1 Diffuser Per 1 Room With Window), C) Replacement Of The Door Joine And Ceilings, G) Replenishing Plasters, H) Forging Old Wall Tiles, I) Location Of Ceramic Tiles On The Walls And Floor In The Kitchen And Bathroom, J) Disassembly Of The Tiled Stove, K) Disassembly Of The Pvc Floor Covering On The Floor And Skirting Slats, L) Pvc Liners With Skirting Boards, M) Placing Partition Walls From G-K Plates To Separate The Bathroom, N) Making A Door Hole In The Bathroom And Installing The Door Joinery, O) Topping Of The Debris, P) Execution And Hanging An Information Board On The Building, R) Development Of The Project Of The Internal Gas Installation S) Heaters, T) Assembly Of A Tw