1. The Subject Of The Contract Is The Execution Of Construction Works Related To The Reconstruction Of Poviat Road No. 1355L In Szczygieł Dolne From 2+740 Km To Km 3+370.2. The Subject Of The Contract Includes The Reconstruction Of The Road Section In The Scope Of:- Preparatory And Demolition Works;- Earthworks;- Construction Of Pavements Of 1.8M Wide From Concrete Cobblestones Framed With A Curb From The Road Side And The Edge From The Green Side;- Construction Of Exits From Concrete Cobblestones Gr. 8Cm From The Connection Of Exits To The Existing Area;- Execution Of New And Correction Of Existing Culverts (With Restoration Of The Surface Above The Culvert);- Change Of Permanent Traffic Organization. 3. A Detailed Description Of The Subject Of The Contract Is Determined By: • Design Documentation With A Pre -Works Of The Works - Annex 9 To Swz • Technical Specification And Acceptance Of Construction Works - Annex 10 To Swz4. If The Ordering Party In The Description Of The Subject Of The Contract Indicated Trademarks, Patents Or Origin, Sources Or A Special Process That Characterizes The Products Or Services Provided By A Specific Contractor, It Is Allowed To Offer Equivalent Solutions, Provided That They Maintain The Same Minimum Technical, Qualitative And Functional Parameters, Etc. The Parameters Should Be Treated In The Order Documents. He Cites Equivalent Solutions, He Is Obliged To Show That The Solution He Offers Meets The Requirements Set By The Contracting Authority. In This Case, The Contractor Attach To The Offer A List Of Equivalent Solutions Along With Its Description Or Standards. 4.2 In The Event That The Description Of The Subject Of The Contract Includes References To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Pzp, The Ordering Party Allows Equivalent Solutions. 4.3 Possible Indicated By The Employer In Swz Own Names, Trademarks, Patents And Place Of Origin Are Justified By The Specificity Of The Subject Of The Contract And Are Intended To Indicate Only The Quality And Parameters Of The Subject Of The Contract Due To The Lack Of Other Sufficiently Accurate Terms That Would Allow The Subject Of The Contract In This Part In This Part Clearly And Exhausting. 4.4. 101 Para. 5 Pzp The Contractor, Who Cites Equivalent Solutions Described By The Ordering Party, Is Obliged To Show That The Proposed Solutions To An Equivalent Extent Meet The Requirements Set Out In The Description Of The Subject Of The Contract In Terms Of Norms, Technical Assessments, Technical Specifications And Technical Reference Systems. 5. Construction Works Performed As Part Of The Subject Of The Contract Will Grant A Minimum Of 60 Monthly Warranty From The Date Of Completion Of The Task Acceptance (Signing The Final Acceptance Report). 6. The Contracting Authority Does Not Provide For The Possibility Of Awarding The Existing Contractor On The Basis Of Art. 214 Para
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.