The Order Includes The Execution Of At Least The Following Works: Demolition Of Curbs - 41 Mb, Demolition Of The Edges - 87 Mb, Ankle Pavement 83.3 M2, Debris Of Debris At Least 15 M3. Making The Pavement Surface Of 92 M2, Edge Installation Of 55 Mb. Making The Surface Of Parking Spaces - Curb 61 M2, Eco - 117 M2 Surface, Color Surface (Place For The Disabled) - 18 M2. Making A Foundation - A Layer According To Horizontal And Vertical Marking In Accordance With The Traffic Organization Design And Road Safety Elements. Land Development. A Parking Space For The Disabled Should Be Made Of Blue -Colored Paving Stones. Painting Places For Charging Electric Cars Should Be Painted In Green With Acrylic Paint For Road Surfaces. In The Electrical Part: Installation Of 2X230v Sockets In The Dashboard. Automatic Opening System Of A Double -Leaf Gate, Two Chargers For Electric Wallbox 11Kw Each. The Contractor Is Obliged To Develop, Agree And Introduce A Traffic Organization Project For Construction Time. The Contractor Will Not Bear The Costs Related To The Seizure Of The Road Lane During The Works. Minimizing The Level Of Emission Of Pollution, Noise, Water And Electricity Consumption, Removal Of All Waste And Packaging Resulting From The Construction Of Works Along With Their Utilization. In Addition, The Contractor Is Obliged To Build The Resulting Demolition Material In Consultation With The Employer. The Detailed Scope Of The Contractors Duties Was Indicated In The Contract Template Constituting Annex 6 To Swz. The Details Are Included In Pt+Sst
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.