Electricity - Electronic Energy Supply. Electricity Supply According To The Mm List And The Cost. Processing Elements: Electricity Calculation Will Be Carried Out By The Selected Bidder Based On Measuring Data That Will Be Determined By The Distribution System Operator On The Accounting Measuring Sites Of The Client, In Accordance With The General Conditions For The Use Of The Network And The Electricity Supply (Official Gazette 100/22) And The National Distribution System (Official Gazette 74/18, 52/18). The Calculation Elements On The Basis Of Which The Electricity Supply Is Calculated Are: 1. The Occupied Work Energy Expressed In Kwh, Which Is Determined By Measuring. Proceeds Of Electricity Sales Items Are Determined According To The Time Of Day And Are Divided Into: - More Daily Tariff Items (Vt), - Lower Daily Tariff Items (Nt), - Unique Tariff (Jt): Electricity Is Shipped At A Measuring Site With A Tariff Model Where Only One Tariff Is Calculated. According To Higher Daily Tariff Items, Electricity Is Delivered From 07:00 To 21:00 In The Winter Of The Winter Time, And From 8:00 To 22:00 During The Time Of Summer Time Counting. The Amount Of The Cost Of Work Energy Is Calculated By Multiplying The Amount And The Unit Price Of The Work Energy In Accordance With The Appropriate Tariff Item. 2. The Workforce Expressed In Kw (For Those Accounting Measuring Sites Where The Power Is Registered), Which Is Determined On The Basis Of A Peak Load. The Top Load Is The Highest Medium Load Measured During The 15 Min Monthly Accounting Period In The Age Of Multiple Daily Tariffs. The Amount Of Labor Costs Is Calculated By Multiplying The Amount And Unit Of The Workforce In Accordance With The Appropriate Tariff Item. When Calculating The Downloaded Work Energy And The Workforce Of Their Size, They Are Rounded Off Throughout The Numbers. 3. The Renewable Production Festival Fees, In Accordance With The Regulation On Electricity Production Production From Renewable Energy And High -Attempted Cogeneration (Official Gazette 116/18, 60/20), And Decision On Renewable Energy Sources And High List Cogeneration (Official Gazette 87/17, 57/17, 57/17) Business Or Non -Disabilities Of Electricity That Are Governed By The Positive Regulations Of The Republic Of Croatia, And Other Possible Fees, Taxes Or Supplements, In Accordance With The Applicable Regulations, And Is Obliged To Calculate The Electricity Supplier To The Buyer Of Electricity.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.