The Subject Of The Contract Is The Implementation Of Architectural And Construction Documentation As Well As Technical As Well As The Implementation Of Construction And Assembly Works On The Basis Of The Concept Approved By The Employer And A Functional And Utility Program Together With A List Of Planned Costs Of Design Work And Planned Costs Of Construction Works, To Design And Perform Construction Works In The Formula Design And Build. The Ground Floor And 1St Floor To The Needs Of The Disabled By Building An External Ramp At The Eastern Entrance To The Building, And The Construction Of A Passenger Crane Serving All Levels In The Building: Basement, Half -Floor, Ground Floor, 1St Floor And 2Nd Floor. - Reconstruction Of The Building Consisting In The Demolition And Construction Of New Internal Walls, Changing The Layout Of The Rooms - According To Demolition And Design Drawings - Reconstruction And Replacement Of Sanitary Installations Within The Reconstructed Sanitary And Pom. Social And All Electrical Installations - Renovation Of Walls, Ceilings And Replacement Of Floors - Replacement Of Lighting In The Building Inside The Building With Energy -Saving And Assembly Of Emergency Lighting In Communication Parts. The Distorted Scope Of Work Related To The Reconstruction Of The Building: - Reconstruction Of The Indicated Partition Walls And Load -Bearing Walls And Construction Of New Ones - Reconstruction Of The Rooms And Changing Their Functions - According To The Drawing Of The Concept - Construction Of The Elevator Shaft And Construction Installation Of A Crane That Supports All Levels - Installation Of Doors And Windows In New Locations - Replacement Of Floors - Renovation Of Walls And Ceilings - Replacement, Reconstruction Of Sanitary And Electrical Installations As Part Of The Implementation Of The Subject Of The Contract Should: - Perform Technical Documentation Necessary To Complete The Investment Task In The Scope Resulting From The Functional And Utility Program, As Well As Obtaining Relevant Administrative Decisions, Departures, Arrangements And Opinions And Opinions Allowing The Commencement Of Works, - Prepare The Construction Site, - Perform Construction Works, - Perform The Supply And Assembly Of Devices, - Obtain Administrative Decisions, Arrangements, Opinions Necessary To Allow The Object To Use, - Conduct Training Employees Indicated By The Contracting Authority Regarding The Use Of Devices.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.