1. Description Of The Subject Of The Contract: 1.1. The Subject Of The Investment Is The Implementation Of The Task Entitled: Improving The Energy Efficiency Of Primary School No. 8 In Siemianowice Śląskie.1.2. As Part Of The Investment,: A) Insulation Of Walls Above And Below The Soil, Along With The Moisture Insulation Of The Walls Below The Ground. B) Insulation Of The Flat Roofs Through Foam Spray, C) Replacement Of Window And Door Joinery And External Door And Partial Replacement Of Internal Joinery, D) Renovation Of Existing Entrance Zones Together With Modernization Of C.O. Along With The Replacement Of The Heat Knot) Replacement Of Rainwater And Sanitary Sewage Systems, G) Mechanical Ventilation, H) Implementation Of Fire Protection Installation. Along With Hydrants, I) Renovation Of Sanitary Facilities, J) Replacement Of Basic And External Lighting Installations, K) Solar Installation.1.3. A Detailed Description Of The Subject Of The Contract Is: A) Design Documentation (Add -On No. 3 To Swz), B) Technical Specifications For The Execution And Acceptance Of Construction Works (Add -On No. 4 To Swz) C) The Bill Of Quantities (Add -On No. 6 To Swz) D) Designed Contractual Provisions (Addition No. 5 To Swz), E) Description Of Works Not Covered By Project Documentation (Addition No. 7 To Swz), - Hereinafter Referred To As Documentation: The Fact That The Basis For Settling Works With The Contractor Is A Flat-Rate Remuneration. The Bill Of Quantities Is Not The Basis For The Contractor To Draw Up A Capacity, And Is Only An Auxiliary, Informative Nature, The Devices Adopted In It Are Approximate. Bearing In Mind The Above Contracting Authorities Does Not Require Submitting With The Offer Of An Offer Cost Estimate. 1.4. For The Subject Of The Contract, The Selected Contractor Will Grant The Contracting Authority A Guarantee And Warranty For A Period In Accordance With The Contractors Offer, But Not Less Than 60 Months From The Day Of The Day After The Day Of The Protocol Collection Without Reservations Of The Entire Subject Of The Contract. 1.5. The Contracting Authority Reserves That The Work Will Be Carried Out On The Building Active, Used By Students And Employees. It Is Recommended That Work Causing Large Noise (E.G. Drilling, Forging, Etc.) Or Conflicting With The Functioning Of The Facility Was Carried Out From Monday To Friday After 15.00 Or On Non -Working Days, And In The Absence Of Such A Possibility, E.G. Due To The Technology Or The Need To Maintain The Continuity Of Works, They Were Carried Out After Prior Arrangements With The Director Of The Institution. The Schedule Of Conducting Works On An Ongoing Basis Must Be Discussed And Agreed With The Director Of The Facility. 1.6. The Contracting Authority Described The Subject Of The Order Without Indicating Trademarks, Patents Or Origin, Source Or Special Process That Characterizes The Product Or Services Provided By A Specific Contractor. If The Contractor Finds That The Subject Of Th
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.