Medite Europe Dac Requires An Upgrade Of Facilities In Its Premises As Outlined In This Document. Site Location: Medite, Redmondstown, Clonmel, Co. Tipperary. It Is Envisaged That The Works Will Commence In Q3 Of 2025. Please Note That The Successful Bidder Is Responsible For The Supply And Installation Of The Fit Out Works, Including Alteration Work As Required, Pipework And All Materials, Components, Plant, Labour And Equipment To Complete The Works As Set-Out In The Scope Of Works. The Works Will Take Place On A Live Mdf Manufacturing Facility As Outlined In The Tender Specification. For The Duration Of This Contract, The Factory Will Remain In Production. Medite Is An Operating Mill With Production Activity On‐Going Within The Area And Therefore Full Compliance With Medite’S Ehs Contractor Requirements Is Necessary. Due To The Nature Of Works As Set Out In This Tender And Other Maintenance + Construction Activity Being Carried Out On Site, These Have Been Deemed To Be “Construction Work’’ As Per The Hsa’S Safety Health And Welfare At Work (Construction) Regulations 2013. The Project Supervisor Construction Stage Must: • Co-Ordinate The Implementation Of The Construction Regulations By Contractors. • Organise Co-Operation Between Contractors And The Provision Of Information. • Co-Ordinate The Reporting Of Accidents To The Authority. • Notify The Authority Before Construction Commences Where Construction Is Likely To Take More Than 500 Person Days Or 30 Working Days. • Provide Information To The Site Safety Representative. • Co-Ordinate The Checking Of Safe Working Procedures. • Co-Ordinate Measures To Restrict Entry On To The Site. • Co-Ordinate The Provision And Maintenance Of Welfare Facilities. • Co-Ordinate Arrangements To Ensure That Craft, General Construction Workers, And Security Workers Have A Safety Awareness Card, E.G. Safe Pass And A Construction Skills Card Where Required. • Co-Ordinate The Appointment Of A Site Safety Representative Where There Are More Than 20 People On Site. • Provide All Necessary Safety File Information To The Psdp. • Monitor The Compliance Of Contractors And Others And Take Corrective Action Where Necessary. • Notify The Authority And The Client Of Non-Compliance With Any Written Directions Issued. • The Pscs May Issue Directions To Designers Or Contractors. Contractors Must: • Co-Operate With The Pscs. • Provide Any Site-Specific Information Or Relevant Extract Of Your Safety Statement To The Pscs. • Promptly Provide The Pscs With Information Required For The Safety File. • Comply With Directions From Project Supervisors. • Report Accidents To The Authority And To The Pscs Where An Employee Cannot Perform Their Normal Work For More Than Three Days. • Comply With Site Rules And The Safety And Health Plan And Ensure That Your Employees Comply, Identify Hazards, Eliminate The Hazards, Or Reduce Risks During Construction. • Facilitate The Site Safety Representative. • Ensure That Relevant Workers Have A Safety Awareness Card And A Construction Skills Card Where Required. • Provide Workers With Site Specific Induction. • Appoint A Safety Officer Where There Are More Than 20 On Site Or 30 Employed. • Consult Workers And Safety Representatives. • Monitor Compliance And Take Corrective Action. **** Please See The Attached Tender Document For The Full And Complete Scope Of Works
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.