Drain Pumping Station Steinvollan Residential Field . Descriptive Steinvollan Boligsfelt Currently Has Municipal Wastewater Systems With Sludge Separators. Sludge Separators Are Under -Dimensioned And We Record Unwanted Pollution. An Expansion Of A New Drain Pump Station With Associated Pump Line Of Approx. 1.4 Km. Existing Sludge Separators Must Be Removed And A New Pumping Station Is Mounted. There Must Be Operation On The Wastewater System Throughout The Period, So That Our Subscribers Are Not Affected. Pump Line Is 90Mm Pe 100 Sdr 17 And Extends Approx. 1.4 Km. The Nordkjoselva Must Be Crossed Twice. The First Time Using Controlled Drilling And The Second Time It Can Be Drawn In Already Established Goods Pipes. The Flushing Of The Aforementioned Goods Pipes Must Be Expected. See Technical Description For Details.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.