The Subject Of The Contract Is Construction Work. The Subject Of The Contract Is The Execution Of Construction Works In Accordance With The Design Documentation Approved And Provided By The Employer Entitled Thermomodernization Of The Port Of Culture In Sandomierz. Wood And Door And Door Locksmith (External Doors) Together With Accompanying And Finishing Works), Installation Of Solar And Ssp Installations, Execution Of External And Internal Electrical Installation Works, Low -Current Installations, Lightning And Grounding Installations, Sanitary Installation, Sanitary Installation (Heating Node, Central Heating Installation Cold Water, Sanitary Sewage System, Rainwater Sewage System, Air Conditioning And Ventilation Installation) And Construction Works Protecting The Switchgear And Energy Storage. The Subject Of The Contract Also Includes Repairs (Plaster) Of Walls And Ceilings After Furrowing And Discharge. The Task Is Implemented With Non -Returnable Support From The National Plan Of Reconstruction And Increasing Charges (Kpo), Component B Green Energy And Reduction Of Energorestation, Investment B1.1.4. Strengthening The Energy Efficiency Of Local Social Activity Objects. Note: The Order Does Not Include The Implementation Of Suspended Ceilings, Renovation Of Bathrooms With White Assembly, Replacement Of Interior Doors, Replacing The Ankle In The Atrium, Comprehensive Painting Of Walls And Ceilings, Purchase And Assembly Of The Wipers System, The Belaying System On The Roof, Equipment In The Fire Extinguishers And The Signal Marking And The Signal Marking, Pictograms, Installation Of Structures, Construction For The Lighting Bridge, And Ladders To On The Roof. In Bathrooms, Installations And Floors Should Be Made In Accordance With The Design Documentation. A Detailed Description Of The Subject Of The Contract Is Determined By: Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, Bill Of Quantities - Constituting Annex No. 9 To Swz (Technical Documentation) And The Draft Agreement Constituting Annex No. 8 To Swz. The Completion Of The Main Construction Works Was Given In The Daily Works. Above The Statements (Individual Plants) Are Only An Auxiliary In The Valuation Of The Value Of Works By The Contractor. The Answers Given At The Stage Of The Proceedings Are An Integral Part Of Swz. Documents Describing The Subject Of The Contract Should Be Treated As Mutually Explaining. As Part Of The Subject Of The Contract, It Should Be: 1) All Auxiliary And Accompanying Works, Which Are Necessary For The Proper Performance Of Works, 2) Also Perform All Other Works, Research (Laboratory), Activities, Duties And Requirements Arising From The Contract, Technical Specification, Documentation, 3) Perform As -Built Documentation In 2 Copies. Attention!!! The Contracting Authority, In Accordance With Art. 99 Para. 5 Of The Public Procurement Law, Allows The Offer Of Equivalent Products. In The Event That In The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.