The Planned Investment Is A Building Object In Which The Following Elements Include. The Designed Expansion Is Planned As A Basement, 2-Storey Covered With A Single-Pitched Roof With A Slope Angle Of 5%. The Shape Of The Designed Building Complicated In The Shape Of The Letter T With A Total Span Of The Existing Building Of 16.11M X 43.36Mm With Dimensions Of 6.46Mx3.05M And 16.12M X 15.20M, Load -Bearing Walls Arranged Parallel To Each Other. The Existing Building Covered With A Gable Roof With A Slope Angle 5%. The Construction Of The Building On The Plot, As In The Project Of The Drainage. The Underpired Construction Will Be Made In Traditional Brick And Reinforced Concrete Technology. The Structure Of The Ceiling Above The Basement, Ground Floor And Above The First Floor Made As A Reinforced Concrete Slab. The Building Was Founded On Foundation Benches. External Loading Walls Made Of Silicate Block 24Cm, Insulated With Polystyrene Gr. 20Cm. Internal Loading Walls Made Of Silicate Blocks 24Cm, Indoor Walls Made Of Silicate, Wall Thickness 12Cm. Gravitational/Mechanical Ventilation. Each Construction On The Market Should Have A Certificate Of Compliance With The Polish Norm Or Technical Approval Or A Declaration Of Manufacturers Compliance With The Polish Norm Or Technical Approval. The Product Should Be Marked With The Ce Or B Construction Mark. Inside The Building, The Rooms Will Be Lined With Material Approved For Use. General Measures Will Be Arranged And Painted With Emulsion Paints Of General Purpose With A Certificate Of Attestation For Rooms Where People Can Stay. In The Case Of The Planned Investment, There Will Be No Accumulated Impact. Environmental Impact Will Only Be During The Implementation Of The Investment. The Noise Arising During The Implementation Will Be Temporary, Short -Lived And Limited To The Area Of Work. Mechanical Ventilation Is Planned In The Designed Building. The Planned Construction Will Not Cause A Significant Change In The Natural Environment. In The Rooms Intended For The Stay Of People, Daylighting Was Provided, Adapted To Its Purpose, Shape And Size, Taking Into Account The Conditions Set Out In § 13 Of The Regulation Of The Minister Of Infrastructure Of April 12, 2002 On Technical Conditions To Be Met By Buildings And Their Location, And In General Health And Safety Regulations, Taking Into Account Both Existing And Designed Buildings. The Room Intended For The Stay Of People Was Provided, In Accordance With § 57 Of The Regulation Of The Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location, The Ratio Of Windows, Calculated In The Light, To The Floor Surface Is At Least 1: 8, While In Another Room Where Daytime Lighting Is Required For Purpose - At Least 1:12. The Rooms Intended For The Temporary Stay Of People Are Provided With Lighting With Artificial Light According To Utility Needs (Staying Up To Two Hours A Day).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.