3 Disabled. In The Field Of Reconstruction, The Basement Of The Basement Under The Part Of The Northern Apartment And The Reconstruction Of The Ground Floor Rooms Along With Their Function Are Expected. The Ceiling Above The Ground Floor Is To Be Rebuilt (In The Southern Part Of The Structure, In The Northern Part, The Reconstruction Of The Wooden Beam Ceiling Into A Reinforced Concrete Slab). A New Roof Structure Reproducing The Current Size, Shape And Decrease Due To The Poor Technical Condition Of The Current Roof Structure Is To Be Made Above The Entire Building. As Part Of The Expansion, A Roofing Above The Entrances To The Building Is To Be Performed. As A Result Of The Investment, The Building In Question Will Be A One -Story Building, With An Attic Available Through A Passage Located Within The Expansion / Roofing Above The Platforms, Non -Basement, With Gable Roofs Above The Main Block Of The Building And Above The Expansion. The Designed Rooms Will Be Equipped With Separate Internal Electrical Installations, Water. - Can. And Central Heating. 2. The Scope Of The Expected Works Includes In Particular: Exercise And Thermal Insulation Of The Foundations; Horizontal Insulation Of The Walls Using The Injection Method To Make New Load -Bearing And Partition Walls, Bricks, Chimney Stem, Etc. Execution Of Reinforced Concrete Ceilings Along With The Lintels, Wreaths, Etc. Execution Of The Roof Structure Above The Entrance To The Building, Covering, Glowing And Processing, Thermal Insulation; Laying Wall Tiles In Toilet Rooms; Performing New Floor Layers With Anti -Excavations; Installation Of Door And Window Joinery; Painting Walls, Ceilings And Other Elements; Installation Of Utensils In The Toilet (Toilet, Sink, Sink, Handrails For Disabled) Facades; Making New Paved Surfaces Land Development (Fence With Gate And Gate, Humus, Plating Lawns). Implementation Of Electrical And Teletechnical Installations (Connecting And Measuring Boards, Electrical Resources Of Apartments, Apartments, Flats, Lighting Installation, Strength Installation, Teletechnical Installation, Grounding Installation. Expansion Joints, Solar Installation, Protective Installation. Execution Of Sanitary Installations (Installation Of Cold, Hot Water, Sewage System, Central Heating Installation) 3. In The Manner Described In The Design Documentation, The Detailed Technical Specifications Of The Execution And Receipt Of Construction Works (Sstwiorb) And The Contract, Constituting An Attachment To Swz. Were Specified In The Project Documentation. 7.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.