3 The Subject Of The Contract Includes, In Particular: 1) Executive Projects To The Extent In Accordance With Pfu, 2) Execution, Starting And Connecting All Photovoltaic Installations And The Construction Of The Connection With The Entire Security Apparatus, The Measuring System And Telemmetry In Accordance With The Enea Operator Agreed By The Osd, 3) Making All Necessary Measurements On The Dc And Ac, As Well Telemetry And Integration To The Scada Scada Osd Operator, As Well As Execution For Each Pv Substallment Of Thermal Examination, 4) Exercise Of As -Built Documentation, 5) Training For The Service Services At The National Museum In Szreniawa., 6) Connecting Photovoltaic Installations To The Enea Operator. 3. The Detailed Material Scope Of The Order Was Specified In The Functional And Utility Program, Called Pfu, Constituting Annex 7 To Swz, Taking Into Account The Documentation Referred To In Point 3.2.7 - 3.2.12 Swz.4. The Contractor Applying For The Award Of The Contract In Question Is Obliged To Make A Local Vision Of The Place Of Work Under Pain Of Being Rejected. The Vision Will Be Available From 21.07 To 25.07.2025 And From 28.07 To 29.07.2025 Between 9:00 - 14:00, After Notifying The Ordering Party About The Intention To Conduct A Vision. The Notification Should Take Place In Electronic Form Via The E-Sausage Platform At The Latest By 09:00 A Given Day (Out Of The Days Indicated By The Ordering Party), In Which The Contractor Intends To Conduct A Local Vision, Indicating In It The Number Of People And The Time Of Arrival. The Vision Is Mandatory.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.