GTR 99431469

Tenders Are Invited For Execution Of A Temporary Sewage Treatment Installation While Maintaining The Ownership Of The Delivered Accessories By The Bidder

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
99431469
Tendering Authority
Subscribe to view
Tender No
ZP.271.10.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Execution Of A Temporary Sewage Treatment Installation While Maintaining The Ownership Of The Delivered Accessories By The Bidder
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
29-07-2025 Closed
Work Detail
The Purpose Of The Order Is To Reduce The Environmental Nuisance Damaged As A Result Of The Flood Of The Sewage Treatment Plant In Paczków. Tasks Is An Intervention Undertaking, Temporary, Enabling Reduction Of Environmental Losses, Until The Design And Construction Of A New Sewage Treatment Plant. The Operation Consists Of Using The Cubature Of Existing Reservoirs Suitable For Further Operation Together With The Use Of Devices In Possession Of The Ordering Party, Which Has Not Been Damaged Or Was Repaired With The Rental Of The Necessary New Devices During The Operation Of The Temporary Installation. The Existing Reactor And The Inability To Rebuild The Existing Technological System, The Task Assumes The Use Of Available Other Cubic Instead, Changing The Technological Process Assuming Reduced Efficiency And Effectiveness Limited By The Existing Volume. The Task Involves Conducting Intervention Works Consisting In The Assembly Of Existing And Borrowed Devices Of New Ones, In New Locations And Do Not Require A Building Permit And Notification Of Construction Works, Which Due To The Existing Situation Of The Treatment Plant Will Improve The Ecological Effect In A Short Time. The Commission Provides For Launching An Existing Retention Reservoir As A Temporary Reactor Working In Sbr Flow Technology And A Balanced Retention Reservoir Of Excess Sewage, Use Of The Existing 1St Degree Pumping Station, Sopiasclaster, 2 -Degree Pumping Station, Sludge Stabilization And Drainage Installations And Blowers Station In An Identical Technological Function. The Reactor Will Be Equipped With Other Necessary Devices, Borrowed, Along With The Control System. Pollution Expressed By The Bzt5, Chzt And Total Suspension Indicator To The Level Of Permissible Standards (Without Removing Biogenic Compounds) To The Flow Of 500M3/Day And Reduction Of These Pollution By 50% To 60% To The Border Flow Of 800M3/Day. Excess Sewage Will Be Collected In The Existing Earth Reservoir And After Its Filling, Discharged Directly To The Receiver As Diluted Rainwater. At The Stage Of Implementation, The Technological Concept Of The Proposed Solution Should Be Prepared. The Assumed Period Of Operation Of The Temporary Installation Is 3 Years, But It Cannot Be Completed Earlier Than Until The Reconstruction Of The Sewage Treatment Plant Is Rebuilt.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5d441b03-8472-473f-874f-8b780c78ca4c.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders