1. The Subject Of The Contract Is The Development Of Project Documentation And Performing Authors Supervision For The Task Reconstruction Of Poviat Road No. 3805P New Pistons - Project Documentation Locations Of The Beginning Of The Planned Reconstruction Of The Road Fork Of Poviat Road No. 3805P On Karpicko And Wola Dąbrowiecka In Nowe Tłoka, While The End Is The Intersection With National Road No. 32. Development Of The Plot Or Area And Architectural And Construction Design) As Well As A Technical And Executive Design With Obtaining The Necessary Opinions, Arrangements And Decisions Required To Obtain Administrative Decisions Enabling The Implementation Of The Task (Decision To Permission To Implement The Zrid Road Investment), A Permanent Traffic Organization Project). Surpass Top Contracts). Project Assumptions Technical Class Of The Zece Road Category Kr2l Estimated Reconstruction Length Approximately 2.19 Km. The Roadway Should Be Expanded To 6.M. Existing And New Public Conventions From The Mineral And Asphalt Mass. All The Section Through The Entire Section Take Into Account The Pavement With A Minimum Width Of 2 M From Concrete Cube With Microfasis. Provide Communication Services And The Availability Of Real Estate Adjacent To The Public Road. The Hardened Width Of Exits To The Existing Properties To The Width Of The Facts To The Width, And In The Absence Of Gates, The Minimum Paved Width Of The Exit Cannot Be Less Than 5 M. For Each Property, Which At The Time Of Development Of The Documentation Has Provided Communication Service From The Poviat Road, Even In The Absence Of A Typical Congress One Congress. In The Event That The Property Is Served With More Existing Conventions, All Should Be Taken Into Account. Consider The Cutting Of Trees And Shrubs. Consider The Reconstruction Of 2 Culverts. Take Into Account The Reconstruction Of Ditches. Design A Rainwater Sewage System. The Contracting Authority Provides For A Maximum Of 94 Plots For Division, Which Should Be Taken Into Account In The Valuation Of The Subject Of The Contract. Take Into Account The Removal Of Collision With The Existing Utilities (Water Supply, Sanitary, Gas, Electric And Telecommunications Networks, Etc.) Design Road Lighting. Designing The Elements That Slow Down Traffic At The Entrance To The Town From National Road No. 32. Explusing Technical Specification - Sst Should Be Prepared In Accordance With The Applicable Provisions Refer To A Specific Investment. All Requirements Should Be Recalled Directly - It Is Unacceptable To Refer In The Sst Text To Records And Etc. - The Required Requirements Set To Individual Materials Are Undeniably And Clearly Indicated The Basis For Allowing The Material To Build Up As Well As The Acceptance Procedure. Protect The Map For Design Purposes Should Be Resumed If Necessary On The Basis Of The Border Lane Boundary Points With Border Lanes According To The Principles Set Out In The Provisions Regarding Geodesy And Cartog
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.