Motion Part Of The Movement In The Whole Line, The Width Of The Line: 0.1 M, Construction Of The Grounds And Smoothing Layers: Sand-Gravel Mixture, From Large Sand, Establishment Of 40-70 Mm Fractional Breakdowns Of Fractionshado £ 15 Cm, Ozuboshal Car, 17 T Transportation Distance - 5 Km. 1St-Grade Load, The Capacity Of The Chain Of 0.65 (0.5-1) M3 Is Drilling With Excavators By Loading The Group By Loading The Cars, Group: 2 (Useless Ground), Demolition Of The Cover And Ground: Asphalt-Concrete, The Interruption Of The Layer Of The Asphaltbeton Road Cover By Applying Foreign Production Milling To 2, 200 Mm To Milling Wide, Thickness Of The Layer: 10 Cm, Putting Cover Pans (Without Material), Establishment Of Hatch (Without Material), 390X190x188 Mm Masza Of The Walls Of Buildings And Facilities Of The Saws Of Mm In Size: 19 Cm Thick, Dummy Demolition Of Cast Iron Hatches, Putting Cover Pans (Demolition), Fracture Of The Movement Partition With A Broken Line With 0.1 M, When The Ratio Of The Bar And Range Is As Follows: 1: 1
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.