Construction Work - 303478 - Building Work Immediate Measures Stägjitschuggen. Since The Storms In June 2024, The Mgbahn Has Carried Out Various Immediate Measures On The Bridge Pillars In The River Bed Of The Matter Vispa In Order To Prevent Future Flood -Related Damage, Plan Mgbahn And Dfm In The Winter Months 2025/2026 To Carry Out Further Construction Work In This Area. The Aim Is To Use The Low Water Period From November 2025 - April 2026 As Best As Possible. The Measures Include Construction Work For The Production Of Property Protection For The Cantonal Road And The Railway Line. This Includes The Execution Of Block Rates To Secure The Embankments And The Targeted Construction Of Locally Arranged Block Ramps To Stabilize The River Sole.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.