Non -Needled Geotextile Of Continuous Polyester Filament Fabric, Minimum Tensile Resistance Of 4, 7 Kn/M (Gt - 07), (Supplied In A Roll Of 2, 30X100m), Drain Tube, Corrugated, Spiral, Flexible, Perforated, High Density Polyethylene (Hdpe), Dn 100 Mm, (4) For Drainage - Roller 093/2006 - E.M), Dn 160 Mm, (6) For Drainage - (Dnit Standard 093/2006 E.M), Sewage Cap, Pvc, Ocher, Orange, With Jei, Dn 200Mm, Dn 300Mm, 14/07/2025, 17/07/2025, Long Curve, 90, Bb Sewage, Orange Including Sealing Ring, Reduction, Pocket Tip, Dn 300X200, Te, 90 Degrees, Bbb, Dn 200 Mm, For Orange Sewage Collection, Including Sealing Ring, Dn 300 Mm, Pvc Sewage Collector, Dn 150 Mm (Nbr 7362) (Nbr 7362), Dn 300 Mm (Nbr 7362), Included Sealing Ring-Tube With 6 Meters, High Density Polyethylene Geombbred (Hdpe), With High Molecular Weight, 97, 5 Of Virgin Resin And Addition Of Black Tobacco, Thermo-Stabilizers And Antioxids. Fully Attending The Specifications Present In The Global Reporting Initiative (Gri) Gm13 Standard, With A Thickness Of 02 (Two) Millimeters. Other Geomembrane Characteristics:-Minimum Density Of 94 (Ninety-Four) G/Cm³; -Resistance To Minimum Flow Traction Of 29 (Twenty-Nine) Kn/M; -Resistance To The Minimum Rupture Traction Of 53 (Fifty-Three) Kn/M;-At Least 700 (Seven Hundred);-Minimum Tear Resistance Of 249 (Two Hundred And Forty-Nine) N;-Minimum Punching Of 640 (Six Hundred And Forty) N; (Two)-Black Smoke Content Of 02 (Two) To 03 (Three);-Minimum Oxidation Time Of 100 (One Hundred) Atm/200C Min;-500 (Five Hundred) Hours) Hours. The Product Should Be Delivered According To The Manufacturers Standard In Rollers/Coils With Width Not Less Than 5, 00 Meters And Present A Guarantee Of At Least 5 Years To Not Degrade And Weathering, Valid After Delivery Date., 2Mm Geomembras Installation Services. Specialized High Density Polyethylene Geombrane Installation Services (Hdpe), According To Nbr Abnt 16.199. With The Exception Of The Geomembrane To Be Provided By The Contractor, The Services Include All Inputs Such As Hdpe Welding Cord And Tube Or Interference Finishing Services (Up To 12 Pcs). Perform Quality Tests And Present Technical Report With The Results And Other Conditions Established In This Term Of Reference, Item 7.4