Supply And Installation Of Workplate With Galvanized Plate And Wood Structure. Af03/2022Ps, Mechanized Vacant Excavation With Depth Up To 1, 5 M (Amount Upstream And Downstream/A Composition Per Stretch), Retroscava. (0, 26 M3), Width Of 0, 8 M To 1, 5 M, In 1St Category Soil, Low -Level Places. Af09/2024, Ditch Background Preparation With Width Less Than 1, 5 M (Natural Soil Hit). Af08/ 2020, Skinny Concrete For Ballast, 1: 4, 5: 4, 5 (Dry Cement/ Sand/ Gravel 1) - Mechanical Preparation With Concrete Concrete 400 L. Af05/ 2021, Manual Ditches With Mechanized Compaction. Af04/2016, 17/07/2025, Transportation With 14 M³ Tilting Truck, In Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af07 / 2020, Load, Maneuver And Discharge Of Soils And Granular Materials In 14 M³ Tillage Truck - Load With Loader (Bucket Of 1, 7 To 2, 8 M³ / 128 Hp) And Free Discharge (Unit: M3). Af07/2020, Concrete Tube For Rainwater Collection Networks, 400 Mm Diameter, Rigid Joint, Installed In A Low Interference Level - Supply And Settlement. Af03/2024, Double Wall Corrugated Pvc Tube For Sewage Collection, Dn 150 Mm, Elastic Joint - Supply And Settlement. Af01/2021, Transport With 10 M³ Tilting Truck, Inside (Inside The Flowerbed - Unit: M3xkm). Af07/2020, Maneuver And Discharge Of Soils And Granular Materials In Tilting Truck 6 M³ - Loading Loader (1 Bucket, Mechanized Ditch With Backhoe (Retro Bucket Capacity: 0, 26 M³/Power: 88 Hp), Width Up To 0, 8 M, Depth Up To 1, With Argilo -Argile Soil. Predominantly Clay Soil Sub -Track Compact.