5.1. The Subject Of The Contract Is The Service: Project Development And Stabilization Of A Dual -Function Geodetic Warp Points In The Chojnice Poviat. The Subject Of The Order Is The Development Of The Project And Stabilization Of A Dual -Functional Geodetic Warp Points In The Chojnice Poviat In The Area Of Selected Districts Of The Brysa Commune: Czarnowo, Czapiewice, Czyczki, Kaszuby, Kaszuby, Kaszuby, Czyczkowa, Kaszuby, Czyczki, Czyczki, Czyczki, Czyczki, Czyczki, Czyczki, Czyczki, Czyczki, Czyczki, Czyczki, Czyczki, Czyczki Kosobudy, Leśno, Little Chełmy, Little Gliśno, Lubnia, Główczewice, Orlik, Shilly And Zalesie. A Project Is Assumed To Be Developed, Such As Geodetic Warp Signs That Are Optimal In A Given Poviat Area. When Designing New Characters, The Contractor Should Choose The Right Sign Or Set Of Characters Based On The Quantities Given In These Wta, Taking Into Account The Inventory Of The Condition Of The Warp Carried Out For The Purpose Of This Study. The New Designed Duplicate Warp Points Will Be Stabilized, Control Measurement, Topographic Descriptions, Numbering Adaptation To The Ordinance Of The Minister Of Development, Labor And Technology Of July 6, 2021 On Geodetic, Gravimetric And Magnetic Booms (Journal Of Laws 2021 Item 1341). Managing All Work Should Be Entrusted To A Person With Professional Qualifications Referred To In Art. 43 Point 3 Of The Geodetic And Cartographic Law. The Subject Of The Contract Was Divided Into Three Stages: Stage I - The Supply Of The Bdos Base With The Results Of The Inventory Of The Status Of Warfare Points. Operat P. 2202.2025.1748Etap Ii - Development Of A Dual -Function Geodetic Warp Project In The Chojnice Poviat In The Area Of Selected Precincts Of The Brusy Commune: Czarnowo, Czapiewice, Czyczkowy, Kaszuba, Kosobudy, Leśno, Little Chełmy, Małe Gliśno, Lubnia, Główczewice, Orlik, Visor And Zalesie. - Stabilization Of Newly Assumed Points, Control Measurement Of These Points. The Material Necessary To Perform The Subject Of The Contract Will Be Made Available After Signing The Contract. The Contractor Is Obliged To Confirm The Receipt Of Materials, While In The Case Of Numerical Data It Will Be Possible To Provide Them And Subsequent Replacement Using The File Transfer Protocol. The Subject Of The Contract Was Specified In Detail In The Description Of The Subject Of The Contract, Attachments To It (Technical Conditions And A Technical Report On The Inventory Of The Condition Of The Matrix P. 2202.2025.1748) And The Planned Provisions Of The Contract, Constituting Attachments To Swz.