Tenders Are Invited For Modernization Of Ventilation Installations In The Field Of Replacement Of Existing Ventilation And Climate Devices Along With Their Power Supply And Control Automation In The Building Of The Kowr Ot Headquarters In Wrocław
Tenders Are Invited For Modernization Of Ventilation Installations In The Field Of Replacement Of Existing Ventilation And Climate Devices Along With Their Power Supply And Control Automation In The Building Of The Kowr Ot Headquarters In Wrocław
2. The Subject Of The Contract Modernization Of The Ventilation Installation In The Field Of Replacement Of Existing Ventilation And Climate Devices Along With Their Power Supply And Control Automation In The Kowr Ot Headquarters Building In Wrocław At Ul. Mińska 602.1 The Purpose Of The Order And The Scope Of Works. The Construction Of Construction Works Is To Dismantle Existing Ventilation Devices- Two Airflower Ventilation Units N1w1 With A Capacity At A Level Of 4700M3/H, The Second N2w2 Headquarters With A Capacity Of 9500M3/H, Which Are Currently Located On The Roof Of The Existing Object:- All The Equipment Cooperating With Two. Ventilation Units: Pumps, Valves, Pressure Gauge, Expansion Vessels- A Power Supply Installation And A Refrigerant- Existing Subtractal, Unless After Making A Structural Analysis, The Contractor Finds That The Structure Will Use The Structure For The New Device- Existing Ventilation Channels In Addition To Roof Crossings- New Channels Should Be Adapted To The Existing Transitional Ventilation Units N1w1 And N2w2 Are Served By The Office And Social Rooms Of The Entire Building Of The National Agricultural Support Center. The Local Department In Wroclaw. Therefore, The Reverse Setting On The Roof Will Be A Freon Aggregate. In The Scope Of The Task There Is Utilization Of Demolition Materials In The Object. 2.2 The Scope Of Works In The Part Regarding The Design Of The Replacement Of Ventilation Devices Includes The Following Activities- Development Of The Executive Project Of The Replacement Of The Existing Ventilation System In Accordance With The Requirements Of The Ordering Party Contained In The Present Functional And Use Program And Applicable Provisions And Applicable Provisions Rights: Regulation Of The Minister Of Infrastructure Of April 7, 2004 On The Technical Conditions To Be Met By Buildings And Their Location. Journal Of Laws No. 109 Item 1156 And Of 12/03/2009, By The Minister Of Infrastructure Of 10 December 2010, Amending The Regulation On Technical Conditions To Be Met By Buildings And Their Location. Journal Of Laws 2010 No. 239 Item 1597.2.3 The Scope Of Design Work Includes, Among Others - Inventory Of The Ceiling In Terms Of Foundation Of New Devices (Ventilation Unit, Freon Aggregate), Implementation Of The Load Design- A Supply Of Power Supply To New Devices With Electricity, Lightning Protection Design, Preparation Of Switching On Central Into A Large Energy Management System After Ip. External, Together With A Connection With Existing Executive At The Transition Through The Dachprojekt, Should Be Developed In Accordance With The Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Of Project Documentation, Technical Specifications Of The Implementation And Acceptance Of Construction Works As Well As A Functional And Utility Program (Journal Of Laws Of 2013, Item 1129, As Amended). Acceptance. The Employer Will Change Comments Within 5 Working Days.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.