Part 1 - Hardening Of The Roadside By The Municipal Road In Kamienna, The Object Of The Order Is Hardening Of The Roadside With A Width Of 1.0 M With Concrete Cube, At Główna Street In Kamienna, In Particular: Making The Riverbed Under The Structural Layers Of The Surface With The Removal Of Spoil, Making The Drainage Layer From Sand With A Thickness Of 5 Cm, Making A Foundation Made Of Granite Stone Stone With A Thickness Of 20 Cm, Making A Surface Made Of Concrete Cobblestones 8 Cm Thick On Cement-Sand Beds, Ordering The Adjacent Area For The Execution Of The Seizures. The Detailed Scope Of The Subject Of The Contract As Well As The Technology And The Manner Of Its Performance Are Presented By The Bill Of Quantities And The Detailed Technical Specification Of The Performance And Acceptance Of Works. Additional Requirements: For Works Covered By The Subject Of The Contract, The Contractor Will Guarantee For A Minimum Period Of 3 Years, A Maximum Of 5 Years From The Date Of The Final Acceptance Protocol, All Materials Used To Perform The Subject Of The Contract Must Be In The First Species And Must Have Approvals, Certificates And Technical Approvals Allowing For Use (Certificates, Certificates And Approval) And Be At Least Technically Equivalent To Devices Adopted In The Pre -City Of Works. The Costs Of Labeling, Securing And Conducting Works Should Be Included, The Contractor Bears Full Responsibility For Any Damage And Losses Resulting From Works, The Contracting Authority Allows The Contractor To Familiarize Himself With The Area Where The Works Will Be Carried Out. The Subject Of The Orders Should Be Made In Particular In Accordance With: 1) By The Act Of 7 July 1994 Construction Law, 2) By The Act Of 16 April 2004 On Construction Products, 3) A Preface Of The Works And A Detailed Technical Specification 4) All Necessary Provisions In The Field Of Construction Law, Health And Safety At Work And Fire Protection, Environmental Protection And Applicable Standards. Technical Knowledge. Dividing The Order Into Parts, In The Opinion Of The Contracting Authority, Will Optimize The Offers Presented By The Contractors, Both In Terms Of Quality And Price, And Additionally Protecting The Order Against Failure To Set Up Due To The Failure To Submit A Comprehensive Offer By Any Of The Contractors. The Contractor Is Obliged To Complete The Order On The Principles And Conditions Of The Swz And The Offer.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.