Tenders Are Invited For Construction Of Low -Current Installations, Assembly Of An Automatic Entrance Barrier, Construction Of Small Architecture Facilities In The Former Fort 52A Jugowice - Museum And Scout Movement Center
Tenders Are Invited For Construction Of Low -Current Installations, Assembly Of An Automatic Entrance Barrier, Construction Of Small Architecture Facilities In The Former Fort 52A Jugowice - Museum And Scout Movement Center
1. The Subject Of The Contract Are Construction Works Involving The Construction Of The Video Monitoring System Of The Internal Area Of The Scouting Museum (Camera System On Mast, Lighting Columns And Columns); Executions Raised Automatically In The Entrance Zone Along With A Change In The Type Of Hardening Of The Area In Its Vicinity; Dlazapors Designing The Camera Reading Camera For The Purposes Of Automatically Lowering The Dam; Installing Small Architecture Objects In The Form Of A Visual Identification System (Information Totem At The Entrance Of The Itablicki And Directional Markers) .2. The Order In Question Will Be Made In The Area Located In The Southern Part Of The City Of Krakow. It Includes Onwalka No. 576/4, Precinct 68 Podgórze, At Ul. Forteczna 28 In Kraków, Surrounded By Fort 52A, Jugowice, Entered The Re-Registration Of Monuments Under Number A-836 Of 04.01.1990, Fort With The Surroundings. The Area Is Fortress With A Characteristic Removal Of The Area, Including Mo, Slopes And Equal. In Its Central Part There Is A Newly Restoredfort Of The Museum And The Scout Movement Center, Which Is A Branch Of The Krakow Museum. The Valid Scope Of Works Includes In Particular: A) The Construction Of A Low-Current Installation-Video Monitoring Installation, Announcement No. 2025/Bzp 00259993/01 Of 2025-05-302025-05-30 Bululeet Public Procurement Announcement - The Contract Is Awarded In Basic Mode Pursuant To: Art. 275 Point 1 Of The Act - Construction Work) Expansion Of The Power Supply System (Automatic Firewall System), C) Installation Of The Automatic Dam At The Entrance, D) Construction (Assembly) Of Small Architecture Facilities (As Part Of The Visual Identification System), E) Segmental Demolitions And Disassembly (Edge, Surface), F) Correction, G). Making A New Surface (Zone. Entry), H) Reclamation Of The Neighboring Area (Lawn), I) Cleaning Works.J) Companying Works. Construction Robots Should Be Carried Out During The Museums Working Hours, I.E. From 8.00 To 16.00. Works Carried Out On A Dedate To The Facility Are To Be Carried Out In A Way That Ensures Entry Into The Facility. The Hours Of Construction And The Detailed Scope Of Work Should Be Included In The Material And Financial Schedule And The Contracting Authority Is Replaced. The Contracting Authority Provides For The Contractor To Use The Place Of Storage Of Equipment Needed To Carry Out The Works. The Contracting Authority Will Provide The Contractors With A Sanitary Room That Is Public. 5. The Contractor Is Obliged To Secure Floors, Walls And Ceilings As Well As The Other Interior Of The Building, So As Not To Damage The Improvement Of The Visual And Aesthetic State Of The Museum Building. New: 1) Work Should Be Carried Out In Accordance With The Guidelines Contained In The Building Permit And Submitted Documentation, 2) For Approval, The Materials Used To Accept The Contracting Authority Should Be Presented To The Pattern Adapted To The Historic Objects Or Predict And Tak
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.